Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 1277727

The concept phase design of LNG tank and the fuel supply system on dual-fuel ships


Galić, Helena; Zadravec, Danijel; Bator, Damjan; Ferdelji, Nenad; Rudan, Smiljko; Slapničar, Vedran
The concept phase design of LNG tank and the fuel supply system on dual-fuel ships // Ships and Offshore Structures, Early Access (2023), 1-14 doi:10.1080/17445302.2023.2200337 (međunarodna recenzija, članak, znanstveni)


CROSBI ID: 1277727 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
The concept phase design of LNG tank and the fuel supply system on dual-fuel ships

Autori
Galić, Helena ; Zadravec, Danijel ; Bator, Damjan ; Ferdelji, Nenad ; Rudan, Smiljko ; Slapničar, Vedran

Izvornik
Ships and Offshore Structures (1744-5302) Early Access (2023); 1-14

Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni

Ključne riječi
Dual-fuel ship ; concept phase design ; LNG tank ; fuel gas supply system ; realistic voyage profile

Sažetak
To reduce pollution, LNG is increasingly used as a fuel in the maritime industry. This paper provides a methodology for the concept phase design of the LNG tank and fuel supply system on a ship. First, constraints of the ship, fuel tank and supply are determined. Next, the simultaneous design and optimisation of the fuel tank and supply system under defined constraints and realistic operating profiles is done. Tank design includes tank type, dimensions, insulation and design pressure analysis and structural strength assessment. Fuel supply system analysis is conducted using the developed dynamic model for comparing system configurations and equipment sizing. The methodology is demonstrated on two dual-fuel cruise ships of different sizes. The influence of ship operating conditions on the tank and fuel supply system and their interdependence is examined. Several candidates for the optimal tank design and fuel supply system are determined based on conflicting design objectives.

Izvorni jezik
Engleski

Znanstvena područja
Brodogradnja, Strojarstvo



POVEZANOST RADA


Projekti:
EK-EFRR-KK.01.2.2.03.022 - Centar kompetencija za naprednu mobilnost (Vulić, Nenad; Jurić, Zdeslav; Krčum, Maja; Trogrlić, Boris; Jasak, Hrvoje; Soldo, Vladimir; Slapničar, Vedran; Rudan, Smiljko; Garašić, Ivica; Kožuh, Zoran; Smoljan, Darko; Lozina, Željan; Blagojević, Branko; Ljubenkov, Boris; Krstulović-Opara, Lovre; Bonković, Mirjana; Radić, Joško; Klarin, Branko; Marasović, Ivan, EK - Podrška razvoju Centara kompetencija, referentna oznaka: KK.01.2.2.03.) ( CroRIS)

Ustanove:
Fakultet strojarstva i brodogradnje, Zagreb

Poveznice na cjeloviti tekst rada:

doi

Citiraj ovu publikaciju:

Galić, Helena; Zadravec, Danijel; Bator, Damjan; Ferdelji, Nenad; Rudan, Smiljko; Slapničar, Vedran
The concept phase design of LNG tank and the fuel supply system on dual-fuel ships // Ships and Offshore Structures, Early Access (2023), 1-14 doi:10.1080/17445302.2023.2200337 (međunarodna recenzija, članak, znanstveni)
Galić, H., Zadravec, D., Bator, D., Ferdelji, N., Rudan, S. & Slapničar, V. (2023) The concept phase design of LNG tank and the fuel supply system on dual-fuel ships. Ships and Offshore Structures, Early Access, 1-14 doi:10.1080/17445302.2023.2200337.
@article{article, author = {Gali\'{c}, Helena and Zadravec, Danijel and Bator, Damjan and Ferdelji, Nenad and Rudan, Smiljko and Slapni\v{c}ar, Vedran}, year = {2023}, pages = {1-14}, DOI = {10.1080/17445302.2023.2200337}, keywords = {Dual-fuel ship, concept phase design, LNG tank, fuel gas supply system, realistic voyage profile}, journal = {Ships and Offshore Structures}, doi = {10.1080/17445302.2023.2200337}, volume = {Early Access}, issn = {1744-5302}, title = {The concept phase design of LNG tank and the fuel supply system on dual-fuel ships}, keyword = {Dual-fuel ship, concept phase design, LNG tank, fuel gas supply system, realistic voyage profile} }
@article{article, author = {Gali\'{c}, Helena and Zadravec, Danijel and Bator, Damjan and Ferdelji, Nenad and Rudan, Smiljko and Slapni\v{c}ar, Vedran}, year = {2023}, pages = {1-14}, DOI = {10.1080/17445302.2023.2200337}, keywords = {Dual-fuel ship, concept phase design, LNG tank, fuel gas supply system, realistic voyage profile}, journal = {Ships and Offshore Structures}, doi = {10.1080/17445302.2023.2200337}, volume = {Early Access}, issn = {1744-5302}, title = {The concept phase design of LNG tank and the fuel supply system on dual-fuel ships}, keyword = {Dual-fuel ship, concept phase design, LNG tank, fuel gas supply system, realistic voyage profile} }

Časopis indeksira:


  • Current Contents Connect (CCC)
  • Web of Science Core Collection (WoSCC)
    • Science Citation Index Expanded (SCI-EXP)
    • SCI-EXP, SSCI i/ili A&HCI
  • Scopus


Citati:





    Contrast
    Increase Font
    Decrease Font
    Dyslexic Font