Status report of the n_TOF facility after the 2nd CERN long shutdown period
Status report of the n_TOF facility after the 2nd CERN long shutdown period // EPJ Techniques and Instrumentation, 10 (2023), 10, 13 doi:10.1140/epjti/s40485-023-00100-w (međunarodna recenzija, članak, znanstveni)
CROSBI ID: 1272729 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Status report of the n_TOF facility after the 2nd CERN long shutdown period
Autori
Patronis, N. ; ... ; Bosnar, Damir ; ... ; Žugec, Petar
Kolaboracija
N_TOF Collaboration
Izvornik
EPJ Techniques and Instrumentation (2195-7045) 10
(2023);
10, 13
Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni
Ključne riječi
neutron time of flight, spallation target, nuclear astrophysics ; Neutron physics, neutron induced fission, neutron reactions
Sažetak
During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the n_TOF facility. The most important have been the replacement of the spallation target with a next generation nitrogen-cooled lead target. Additionally, a new experimental area, at a very short distance from the target assembly (the NEAR Station) was established. In this paper, the core commissioning actions of the new installations are described. The improvement in the n_TOF infrastructure was accompanied by several detector development projects. All these upgrade actions are discussed, focusing mostly on the future perspectives of the n_TOF facility. Furthermore, some indicative current and future measurements are briefly reported.
Izvorni jezik
Engleski
Znanstvena područja
Fizika
POVEZANOST RADA
Ustanove:
Prirodoslovno-matematički fakultet, Zagreb
Citiraj ovu publikaciju:
Časopis indeksira:
- Web of Science Core Collection (WoSCC)
- Emerging Sources Citation Index (ESCI)
- Scopus