Pregled bibliografske jedinice broj: 124753
Energy supply monitoring system for industrial plant
Energy supply monitoring system for industrial plant // 12th IMEKO TC4 International Symposium Electrical Measurements and Instrumentation September 25-27, 2002, Zagreb, Croatia Proceedings, Part 1 / Ilić D., Boršić M., Butorac J. (ur.).
Zagreb: IMEKO, HMD, 2002. str. 299-302 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 124753 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Energy supply monitoring system for industrial plant
Autori
Dorić, Dražen
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
12th IMEKO TC4 International Symposium Electrical Measurements and Instrumentation September 25-27, 2002, Zagreb, Croatia Proceedings, Part 1
/ Ilić D., Boršić M., Butorac J. - Zagreb : IMEKO, HMD, 2002, 299-302
Skup
12th IMEKO TC4 International Symposium Electrical Measurements and Instrumentation
Mjesto i datum
Zagreb, Hrvatska, 25.09.2002. - 27.09.2002
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
SCADA ; Energy monitoring
Sažetak
A Supervisory Control and Data Acquisition (SCADA) based system for monitoring and control of the energy supply and the peak load in industry plant has been designed and algorithm for short-term energy forecast was implemented. The paper describes design and implementation of Energy Management System (EMS) consisted of cost effective elements combined with SCADA software application, which makes platform for supporting the economical energy management of industrial businesses. Trend SCADA screen with necessary on-line data for operator peak load limiting action was designed and real time data for control automatic power limiting system was prepared. System was tested and is in use more than three years in chemical industry plant with 1200 kW average power peak load. Such plant was representative sample for Eastern Europe common mid-size industry energy consumer and it was concluded that implemented energy monitoring system indicate investment turn back in less than six months.
Izvorni jezik
Engleski
Znanstvena područja
Elektrotehnika
POVEZANOST RADA
Projekti:
0165108 - Cjelovit mjerni rezultat u dijagnostici i ispitivanju transformatora (Godec, Zdenko, MZOS ) ( CroRIS)
Ustanove:
Fakultet elektrotehnike, računarstva i informacijskih tehnologija Osijek
Profili:
Dražen Dorić
(autor)