Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 1194554

Possibilities of Using Prefabricated Modular Panels for Building NZEB Buildings in Earthquake- Affected Areas in Croatia – Case Study


Begić, Hana; Krstić, Hrvoje
Possibilities of Using Prefabricated Modular Panels for Building NZEB Buildings in Earthquake- Affected Areas in Croatia – Case Study // International Journal of Sustainable Construction Engineering and Technology, 13 (2022), 1; 137-148 doi:10.30880/ijscet.2022.13.01.013 (međunarodna recenzija, članak, znanstveni)


CROSBI ID: 1194554 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Possibilities of Using Prefabricated Modular Panels for Building NZEB Buildings in Earthquake- Affected Areas in Croatia – Case Study

Autori
Begić, Hana ; Krstić, Hrvoje

Izvornik
International Journal of Sustainable Construction Engineering and Technology (2180-3242) 13 (2022), 1; 137-148

Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni

Ključne riječi
Modular prefabricated panels, NZEB buildings, overheating, building technology, construction time & cost

Sažetak
This case study questions the possibility of using the prefabricated modular panels for building nZEB homes in earthquake-affected areas in Croatia. The comparison of the traditional and prefabricated construction was made in terms of construction costs and time, and energy consumption. Four cases of a ground floor family house were simulated in this research: two using modular prefabricated panels and two built traditionally withhollow brick. The energy consumption of all houses was compared to the current Croatian nZEB requirements. Furthermore, the costs, durability, and construction time of prefabricated and traditionally built houses were compared. The results showed that although prefabricated houses consume less energy, and experience lower thermal losses, they are slightly more prone to overheating in the summer. Finally, it was concluded that prefabricated houses are the best solution for current earthquake-caused situation due to their construction time which is significantly shorter compared to the traditionally built houses.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Ustanove:
Građevinski i arhitektonski fakultet Osijek

Profili:

Avatar Url Hrvoje Krstić (autor)

Avatar Url Hana Begić (autor)

Poveznice na cjeloviti tekst rada:

doi publisher.uthm.edu.my

Citiraj ovu publikaciju:

Begić, Hana; Krstić, Hrvoje
Possibilities of Using Prefabricated Modular Panels for Building NZEB Buildings in Earthquake- Affected Areas in Croatia – Case Study // International Journal of Sustainable Construction Engineering and Technology, 13 (2022), 1; 137-148 doi:10.30880/ijscet.2022.13.01.013 (međunarodna recenzija, članak, znanstveni)
Begić, H. & Krstić, H. (2022) Possibilities of Using Prefabricated Modular Panels for Building NZEB Buildings in Earthquake- Affected Areas in Croatia – Case Study. International Journal of Sustainable Construction Engineering and Technology, 13 (1), 137-148 doi:10.30880/ijscet.2022.13.01.013.
@article{article, author = {Begi\'{c}, Hana and Krsti\'{c}, Hrvoje}, year = {2022}, pages = {137-148}, DOI = {10.30880/ijscet.2022.13.01.013}, keywords = {Modular prefabricated panels, NZEB buildings, overheating, building technology, construction time and cost}, journal = {International Journal of Sustainable Construction Engineering and Technology}, doi = {10.30880/ijscet.2022.13.01.013}, volume = {13}, number = {1}, issn = {2180-3242}, title = {Possibilities of Using Prefabricated Modular Panels for Building NZEB Buildings in Earthquake- Affected Areas in Croatia – Case Study}, keyword = {Modular prefabricated panels, NZEB buildings, overheating, building technology, construction time and cost} }
@article{article, author = {Begi\'{c}, Hana and Krsti\'{c}, Hrvoje}, year = {2022}, pages = {137-148}, DOI = {10.30880/ijscet.2022.13.01.013}, keywords = {Modular prefabricated panels, NZEB buildings, overheating, building technology, construction time and cost}, journal = {International Journal of Sustainable Construction Engineering and Technology}, doi = {10.30880/ijscet.2022.13.01.013}, volume = {13}, number = {1}, issn = {2180-3242}, title = {Possibilities of Using Prefabricated Modular Panels for Building NZEB Buildings in Earthquake- Affected Areas in Croatia – Case Study}, keyword = {Modular prefabricated panels, NZEB buildings, overheating, building technology, construction time and cost} }

Časopis indeksira:


  • Web of Science Core Collection (WoSCC)
    • Emerging Sources Citation Index (ESCI)
  • Scopus


Citati:





    Contrast
    Increase Font
    Decrease Font
    Dyslexic Font