SIGNIFICANCE OF 400 kV LINE NORTH-TO-SOUTH THROUGH B&H NETWORK TO CROATIAN POWER SYSTEM AFTER UCTE RECONNECTION
SIGNIFICANCE OF 400 kV LINE NORTH-TO-SOUTH THROUGH B&H NETWORK TO CROATIAN POWER SYSTEM AFTER UCTE RECONNECTION, 2003. (ekspertiza).
CROSBI ID: 115930 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
SIGNIFICANCE OF 400 kV LINE NORTH-TO-SOUTH THROUGH B&H NETWORK TO CROATIAN POWER SYSTEM AFTER UCTE RECONNECTION
Autori
Dizdarević, Nijaz ; Majstrović, Goran ; Bajs, Davor ; Majstrović, Matislav
Izvornik
Energetski institut 'Hrvoje Požar', Zagreb, Hrvatska
Vrsta, podvrsta
Ostale vrste radova, ekspertiza
Godina
2003
Ključne riječi
transmission network; system security and stability; UCTE reconnection
Sažetak
This study is initiated by HEP Transmission and Croatian Independent System and Market Operator (CROISMO). Its main objective is set as to recognise possible influence that 400 kV network in Bosnia and Herzegovina (B&H) may have on security and stability of Croatian (HR) power system after UCTE reconnection. Despite preliminary schedule of activities related to restoration of war damages in Croatian and B&H power systems, it is already clear that reconstruction activities in B&H network will be considerably late. Simultaneously, all planned reconstruction activities in Croatian power system are going well and according to the schedule will be finished till the end of year 2003.
Izvorni jezik
Engleski
Znanstvena područja
Elektrotehnika