Evaluation of Transit Signal Priority for Bus Rapid Transit in Heterogeneous Traffic Flow
Evaluation of Transit Signal Priority for Bus Rapid Transit in Heterogeneous Traffic Flow // Tehnički vjesnik : znanstveno-stručni časopis tehničkih fakulteta Sveučilišta u Osijeku, 28 (2021), 6; 2080-2087 doi:10.17559/tv-20200723124449 (međunarodna recenzija, članak, znanstveni)
CROSBI ID: 1156619 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Evaluation of Transit Signal Priority for Bus Rapid
Transit in Heterogeneous Traffic Flow
Autori
Abbasi, Mohammadhossein ; Hadji Hosseinlou, Mansour ; Sarreshtehdari, Arash ; Mandžuka, Sadko
Izvornik
Tehnički vjesnik : znanstveno-stručni časopis tehničkih fakulteta Sveučilišta u Osijeku (1330-3651) 28
(2021), 6;
2080-2087
Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni
Ključne riječi
Actuated Traffic Signal ; Aimsun ; Cost-Benefit Analysis (CBA) ; Microscopic Traffic Simulation ; Payback Period ; Public Transportation Priority
Sažetak
Inefficient traffic signal control at intersections causes vehicle delays, increased fuel consumption, and vehicle emissions. With respect to the large number of fixed signalized intersections along the 7th line of Tehran BRT, passengers experience long delays and travel time while BRT is defined as a high-quality bus-based transit system that delivers fast and efficient service according to literature. Due to constraints on increasing supply, actuated traffic signal (ATS) and public transportation priority (PTP) are some of the possible signal control methods that can reduce the above-mentioned problems. In this paper, the 7th line of Tehran BRT is simulated using Aimsun. ATS and PTP have been simulated and traffic, environmental and economic indicators of transit and non-transit vehicles have been derived. Finally, a cost- benefit analysis is conducted to calculate the net present value (NPV), internal rate of return (IRR) and payback period (PP) of investment. Results show a decrease in travel time, delay, stop time, fuel consumption and pollutant emissions and an increase in average speed and flow at intersections. The payback period is estimated to be approximately two months, indicating a short- term policy and other economic indices confirm the profitability of project.
Izvorni jezik
Engleski
Znanstvena područja
Tehnologija prometa i transport