Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 1131408

A framework for automatic calculation of life-cycle remediation costs of secondary lining cracks


Kovačević, Meho Saša; Bačić, Mario; Vukomanović, Mladen; Cerić, Anita
A framework for automatic calculation of life-cycle remediation costs of secondary lining cracks // Automation in construction, 129 (2021), 103714, 9 doi:10.1016/j.autcon.2021.103714 (međunarodna recenzija, članak, znanstveni)


CROSBI ID: 1131408 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
A framework for automatic calculation of life-cycle remediation costs of secondary lining cracks

Autori
Kovačević, Meho Saša ; Bačić, Mario ; Vukomanović, Mladen ; Cerić, Anita

Izvornik
Automation in construction (0926-5805) 129 (2021); 103714, 9

Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni

Ključne riječi
LCC framework ; Tunnel lining ; Cracks ; Maintenance ; Tunnel monitoring ; Neural networks

Sažetak
This paper proposes the framework for automatic calculation of secondary lining cracks remediation costs. A study focuses on the structural cracks resulting from the tunnel secondary lining overloading due to rock mass creep. It is based on the multi-phase workflow combining the on-site measurements of behavior of the rock mass surrounding the tunnel and advanced numerical modelling tools assisted by the custom custom-made neural network, as well as the cost calculations. The workflow is established through the developed TunnCrack LCC platform where the data communication protocols between phases provided the straightforward and automatic data flow. Based on the evaluated long-term behavior of a tunnel, the secondary lining crack repair cost could be calculated for the different crack widths. The established platform presents a step forward in proactive estimation of the secondary lining remediation costs, where the monitoring data is continuously used to enhance the estimates of the crack repair costs, providing the tunnel managers with information on lining remediation life cycle costs, thus easing the overall decision-making process.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Ustanove:
Građevinski fakultet, Zagreb

Poveznice na cjeloviti tekst rada:

doi www.sciencedirect.com

Citiraj ovu publikaciju:

Kovačević, Meho Saša; Bačić, Mario; Vukomanović, Mladen; Cerić, Anita
A framework for automatic calculation of life-cycle remediation costs of secondary lining cracks // Automation in construction, 129 (2021), 103714, 9 doi:10.1016/j.autcon.2021.103714 (međunarodna recenzija, članak, znanstveni)
Kovačević, M., Bačić, M., Vukomanović, M. & Cerić, A. (2021) A framework for automatic calculation of life-cycle remediation costs of secondary lining cracks. Automation in construction, 129, 103714, 9 doi:10.1016/j.autcon.2021.103714.
@article{article, author = {Kova\v{c}evi\'{c}, Meho Sa\v{s}a and Ba\v{c}i\'{c}, Mario and Vukomanovi\'{c}, Mladen and Ceri\'{c}, Anita}, year = {2021}, pages = {9}, DOI = {10.1016/j.autcon.2021.103714}, chapter = {103714}, keywords = {LCC framework, Tunnel lining, Cracks, Maintenance, Tunnel monitoring, Neural networks}, journal = {Automation in construction}, doi = {10.1016/j.autcon.2021.103714}, volume = {129}, issn = {0926-5805}, title = {A framework for automatic calculation of life-cycle remediation costs of secondary lining cracks}, keyword = {LCC framework, Tunnel lining, Cracks, Maintenance, Tunnel monitoring, Neural networks}, chapternumber = {103714} }
@article{article, author = {Kova\v{c}evi\'{c}, Meho Sa\v{s}a and Ba\v{c}i\'{c}, Mario and Vukomanovi\'{c}, Mladen and Ceri\'{c}, Anita}, year = {2021}, pages = {9}, DOI = {10.1016/j.autcon.2021.103714}, chapter = {103714}, keywords = {LCC framework, Tunnel lining, Cracks, Maintenance, Tunnel monitoring, Neural networks}, journal = {Automation in construction}, doi = {10.1016/j.autcon.2021.103714}, volume = {129}, issn = {0926-5805}, title = {A framework for automatic calculation of life-cycle remediation costs of secondary lining cracks}, keyword = {LCC framework, Tunnel lining, Cracks, Maintenance, Tunnel monitoring, Neural networks}, chapternumber = {103714} }

Časopis indeksira:


  • Current Contents Connect (CCC)
  • Web of Science Core Collection (WoSCC)
    • Science Citation Index Expanded (SCI-EXP)
    • SCI-EXP, SSCI i/ili A&HCI
  • Scopus


Citati:





    Contrast
    Increase Font
    Decrease Font
    Dyslexic Font