Pregled bibliografske jedinice broj: 1128146
Reconstruction and restoration of the upper bridge in Nin
Reconstruction and restoration of the upper bridge in Nin // Conference Paper Source type Conference Proceedings ISBN 978-385748169-7 View more IABSE Symposium, Wroclaw 2020: Synergy of Culture and Civil Engineering - History and Challenges, Report / Bień, Jan ; Biliszczuk, Jan ; Hawryszków¸, Paweł ; Hildebrand, Maciej ; Knawa-Hawryszków, Marta ; Sadowski, Krzysztof (ur.).
Zürich: International Association for Bridge and Structural Engineering (IABSE), 2020. str. 1210-1217 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 1128146 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Reconstruction and restoration of the upper bridge
in Nin
Autori
Štimac Grandić, Ivana ; Grandić, Davor ; Šćulac, Paulo ; Matešić, Leo ; Krolo, Paulina
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Conference Paper Source type Conference Proceedings ISBN 978-385748169-7 View more IABSE Symposium, Wroclaw 2020: Synergy of Culture and Civil Engineering - History and Challenges, Report
/ Bień, Jan ; Biliszczuk, Jan ; Hawryszków¸, Paweł ; Hildebrand, Maciej ; Knawa-Hawryszków, Marta ; Sadowski, Krzysztof - Zürich : International Association for Bridge and Structural Engineering (IABSE), 2020, 1210-1217
ISBN
978-3-85748-169-7
Skup
IABSE Symposium "Synergy of Culture and Civil Engineering - History and Challenges"
Mjesto i datum
Wrocław, Poljska, 07.10.2020. - 09.10.2020
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
Heritage ; Masonry ; Restoration ; Stone bridge
Sažetak
The Upper Bridge originates from the 16th century and is inscribed in the Croatian Registry of Cultural Objects as part of the cultural-historical city of Nin. The bridge was built on low bearing capacity and soft soil. For the most part, the bridge deck is supported on the stone embankment while the passage of sea under the bridge is allowed through three vaults. During its 450 years of existence, the Upper Bridge has been destroyed several times due to river floods or damaged as a result of the ground settlement. In the catastrophic flood that occurred in 2017 the middle third of the bridge was completely destroyed. The presented project of bridge reconstruction and restoration solved the problem of foundation of the bridge and flow problem through the extended flow profile underneath the vaults taking into account the earthquake resistance, durability of the structure and original appearance of the bridge.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo
POVEZANOST RADA
Projekti:
NadSve-Sveučilište u Rijeci-uniri-tehnic-18-127 - Poboljšanje proračunskih modela za ocjenu stanja građevinskih konstrukcija (Štimac Grandić, Ivana, NadSve ) ( CroRIS)
Ustanove:
Građevinski fakultet, Rijeka
Profili:
Leo Matešić
(autor)
Paulina Krolo
(autor)
Paulo Šćulac
(autor)
Ivana Štimac Grandić
(autor)
Davor Grandić
(autor)