Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 1108696

Airline Fleet Rotables Staggered Replacement Scheduling using Dynamic Approach


Šegvić, Miroslav; Domitrović, Anita; Bazijanac, Ernest; Ivanjko, Edouard
Airline Fleet Rotables Staggered Replacement Scheduling using Dynamic Approach // Transformation of Transportation / Petrović, Marjana ; Novačko, Luka (ur.).
Cham: Springer, 2021. str. 141-155 doi:10.1007/978-3-030-66464-0_10 (predavanje, recenziran, cjeloviti rad (in extenso), ostalo)


CROSBI ID: 1108696 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Airline Fleet Rotables Staggered Replacement Scheduling using Dynamic Approach

Autori
Šegvić, Miroslav ; Domitrović, Anita ; Bazijanac, Ernest ; Ivanjko, Edouard

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), ostalo

Izvornik
Transformation of Transportation / Petrović, Marjana ; Novačko, Luka - Cham : Springer, 2021, 141-155

ISBN
978-3-030-66463-3

Skup
International Scientific Conference "The Science and Development of Transport" (ZIRP 2020): Transformation of Transportation

Mjesto i datum
Online, 29.09.2020. - 30.09.2020

Vrsta sudjelovanja
Predavanje

Vrsta recenzije
Recenziran

Ključne riječi
rotable components ; replacement schedule ; staggering ; dynamic approach ; backwards allocation ; earliness costs

Sažetak
The purpose of this paper is to describe the application of a dynamic approach for scheduling of airline rotable components preventive maintenance in order to minimize earliness costs and maximize on wing time of the components. First, analysis of required service level is performed to determine minimum stock quantity for unscheduled replacements, or removals for repair. Then, a schedule for staggered replacement of propeller blades and hubs for overhaul on a regional turbo-prop aircraft fleet is given, with limited availability of spare blades and other constraints. Results show that a minimal cost solution without part shortages can be obtained.

Izvorni jezik
Engleski

Znanstvena područja
Tehnologija prometa i transport



POVEZANOST RADA


Ustanove:
Fakultet prometnih znanosti, Zagreb

Poveznice na cjeloviti tekst rada:

doi

Citiraj ovu publikaciju:

Šegvić, Miroslav; Domitrović, Anita; Bazijanac, Ernest; Ivanjko, Edouard
Airline Fleet Rotables Staggered Replacement Scheduling using Dynamic Approach // Transformation of Transportation / Petrović, Marjana ; Novačko, Luka (ur.).
Cham: Springer, 2021. str. 141-155 doi:10.1007/978-3-030-66464-0_10 (predavanje, recenziran, cjeloviti rad (in extenso), ostalo)
Šegvić, M., Domitrović, A., Bazijanac, E. & Ivanjko, E. (2021) Airline Fleet Rotables Staggered Replacement Scheduling using Dynamic Approach. U: Petrović, M. & Novačko, L. (ur.)Transformation of Transportation doi:10.1007/978-3-030-66464-0_10.
@article{article, author = {\v{S}egvi\'{c}, Miroslav and Domitrovi\'{c}, Anita and Bazijanac, Ernest and Ivanjko, Edouard}, year = {2021}, pages = {141-155}, DOI = {10.1007/978-3-030-66464-0\_10}, keywords = {rotable components, replacement schedule, staggering, dynamic approach, backwards allocation, earliness costs}, doi = {10.1007/978-3-030-66464-0\_10}, isbn = {978-3-030-66463-3}, title = {Airline Fleet Rotables Staggered Replacement Scheduling using Dynamic Approach}, keyword = {rotable components, replacement schedule, staggering, dynamic approach, backwards allocation, earliness costs}, publisher = {Springer}, publisherplace = {online} }
@article{article, author = {\v{S}egvi\'{c}, Miroslav and Domitrovi\'{c}, Anita and Bazijanac, Ernest and Ivanjko, Edouard}, year = {2021}, pages = {141-155}, DOI = {10.1007/978-3-030-66464-0\_10}, keywords = {rotable components, replacement schedule, staggering, dynamic approach, backwards allocation, earliness costs}, doi = {10.1007/978-3-030-66464-0\_10}, isbn = {978-3-030-66463-3}, title = {Airline Fleet Rotables Staggered Replacement Scheduling using Dynamic Approach}, keyword = {rotable components, replacement schedule, staggering, dynamic approach, backwards allocation, earliness costs}, publisher = {Springer}, publisherplace = {online} }

Citati:





    Contrast
    Increase Font
    Decrease Font
    Dyslexic Font