Early Stage Construction Cost Prediction in Function of Project Sustainability


Car-Pušić, Diana; Mlađen, Marko
Early Stage Construction Cost Prediction in Function of Project Sustainability // Current Topics and Trends on Durability of Building Materials and Components / Serrat, Carles ; Casas, Joan Ramon ; Gibert, Vicente (ur.).
Barcelona: International Center for Numerical Methods in Engineering (CIMNE), 2020. str. 631-638 doi:10.23967/dbmc.2020.048 (pozvano predavanje, međunarodna recenzija, cjeloviti rad (in extenso), ostalo)


CROSBI ID: 1108253 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Early Stage Construction Cost Prediction in Function of Project Sustainability

Autori
Car-Pušić, Diana ; Mlađen, Marko

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), ostalo

Izvornik
Current Topics and Trends on Durability of Building Materials and Components / Serrat, Carles ; Casas, Joan Ramon ; Gibert, Vicente - Barcelona : International Center for Numerical Methods in Engineering (CIMNE), 2020, 631-638

ISBN
978-84-121101-8-0

Skup
15th International Conference on Durability of Building Materials and Components (DBMC 2020)

Mjesto i datum
Barcelona, Španjolska, 20.10.2020. - 23.10.2020

Vrsta sudjelovanja
Pozvano predavanje

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
Building Construction, Contracted Cost, Realized Cost, Predictive Modelling Software, Machine Learning

Sažetak
Construction project costs often reach values higher than planned. Accuracy in project cost estimation is one of the most important criteria for project success, even for its sustainability. The main idea of this research is to examine the relationship between realized cost and contracted cost values for residential buildings. The aim of the research is to determine the mathematical relationship between realized and planned costs in the project implementation phase by using a few mathematical methods and some machine learning methods in comparison to linear regression. This would enable validation of methods themselves by comparing and evaluating the obtained relevant parameters. Comparison would be performed on two levels, based on its general characteristics, as well as on the results of their application on the basis of 24 building reconstructions and new buildings by comparing the mean absolute percentage error (MAPE) and the determination coefficient (R2 ) using Predictive Modelling Software DTREG (pronounced D-T-Reg). The relationship of realized and planned costs will be determined for the building as a whole and for certain types of construction works. That relationship would enable more realistic budget planning of similar future projects. Cost overrun factors will be analysed for particular types of construction works, as well as the probability of their occurrence, and what measures should be undertaken to prevent or reduce them in similar future projects. The phenomenon known in project planning as "optimism bias" will be analysed in the context of research focus of exceeding the construction cost

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Projekti:
NadSve-Sveučilište u Rijeci-uniri-tehnic-18-125 - Analiza učinaka mjera smanjenja troškova energije i održavanja javnih obrazovnih objekata kroz sustav izvršenja (Car-Pušić, Diana, NadSve - Uniri projekti 2018.) ( CroRIS)

Ustanove:
Građevinski fakultet, Rijeka

Profili:

Avatar Url Mladen Marković (autor)

Avatar Url Diana Car-Pušić (autor)

Poveznice na cjeloviti tekst rada:

doi congress.cimne.com

Citiraj ovu publikaciju:

Car-Pušić, Diana; Mlađen, Marko
Early Stage Construction Cost Prediction in Function of Project Sustainability // Current Topics and Trends on Durability of Building Materials and Components / Serrat, Carles ; Casas, Joan Ramon ; Gibert, Vicente (ur.).
Barcelona: International Center for Numerical Methods in Engineering (CIMNE), 2020. str. 631-638 doi:10.23967/dbmc.2020.048 (pozvano predavanje, međunarodna recenzija, cjeloviti rad (in extenso), ostalo)
Car-Pušić, D. & Mlađen, M. (2020) Early Stage Construction Cost Prediction in Function of Project Sustainability. U: Serrat, C., Casas, J. & Gibert, V. (ur.)Current Topics and Trends on Durability of Building Materials and Components doi:10.23967/dbmc.2020.048.
@article{article, author = {Car-Pu\v{s}i\'{c}, Diana and Mla\djen, Marko}, year = {2020}, pages = {631-638}, DOI = {10.23967/dbmc.2020.048}, keywords = {Building Construction, Contracted Cost, Realized Cost, Predictive Modelling Software, Machine Learning}, doi = {10.23967/dbmc.2020.048}, isbn = {978-84-121101-8-0}, title = {Early Stage Construction Cost Prediction in Function of Project Sustainability}, keyword = {Building Construction, Contracted Cost, Realized Cost, Predictive Modelling Software, Machine Learning}, publisher = {International Center for Numerical Methods in Engineering (CIMNE)}, publisherplace = {Barcelona, \v{S}panjolska} }
@article{article, author = {Car-Pu\v{s}i\'{c}, Diana and Mla\djen, Marko}, year = {2020}, pages = {631-638}, DOI = {10.23967/dbmc.2020.048}, keywords = {Building Construction, Contracted Cost, Realized Cost, Predictive Modelling Software, Machine Learning}, doi = {10.23967/dbmc.2020.048}, isbn = {978-84-121101-8-0}, title = {Early Stage Construction Cost Prediction in Function of Project Sustainability}, keyword = {Building Construction, Contracted Cost, Realized Cost, Predictive Modelling Software, Machine Learning}, publisher = {International Center for Numerical Methods in Engineering (CIMNE)}, publisherplace = {Barcelona, \v{S}panjolska} }

Citati:





    Contrast
    Increase Font
    Decrease Font
    Dyslexic Font