Work performance as part of a determined system of a construction project


Dvornik-Perhavec, Daniela; Vidaković, Držislav
Work performance as part of a determined system of a construction project // REHABEND 2020 – 8th Euro-American Congress on Construction Pathology, Rehabilitation Technology and Heritage Management, (2.1. Theoretical criteria of the intervention project.) / Lombillo, Ignacio ; Blanco, Haydee ; Boffill, Yosbel (ur.).
Granada: University of Cantabria, 2020. str. 1292-1303 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)


CROSBI ID: 1094053 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Work performance as part of a determined system of a construction project
(Work performance as part of a determined system of a construction project)

Autori
Dvornik-Perhavec, Daniela ; Vidaković, Držislav

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni

Izvornik
REHABEND 2020 – 8th Euro-American Congress on Construction Pathology, Rehabilitation Technology and Heritage Management, (2.1. Theoretical criteria of the intervention project.) / Lombillo, Ignacio ; Blanco, Haydee ; Boffill, Yosbel - Granada : University of Cantabria, 2020, 1292-1303

ISBN
978-84-09-17871-1

Skup
8th Euro-American Congress Construction Pathology, Rehabilitation Technology and Heritage Management

Mjesto i datum
Granada, Španjolska, 28.09.2020. - 30.09.2020

Vrsta sudjelovanja
Predavanje

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
determined system, construction project, uncertainties, work performance

Sažetak
Every construction project is a system. It is determined with time, work quality and price. If one of these factor breaks, the investor suffers damage that affects the other system (for example sales, people who bought these buildings or flats, bank loans, and so on). Between the start (entry into the system) and the finish point (exit from the system) of the construction project are several solutions available. They are reflected in the economic, technical or time performance of the project. For the successful operation of the system, uncertainties must first be identified. Uncertainties arise from the non-systematic treatment of the project. It is necessary to eliminate them and ensure that the project is as determined as possible. Due to the structure of the project, we expect that the entire construction project is treated as a determined system (determined by the price, deadline, and quality of performed works). However, in the reconstruction of historical objects, we encounter other factors that influence the determination of the system and change it. It is influenced by the factors that the determined system changes into a stochastic system. The causes of the stochastic behavior of the system are when on a determined system involve external factors of a stochastic character or internal mechanisms, which are assumed as a stochastic and change in the system from unknown reasons. In this paper, we analyze the internal factors of work performance, which are important for construction quality, price, and deadline.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Ustanove:
Građevinski i arhitektonski fakultet Osijek

Profili:

Avatar Url Držislav Vidaković (autor)

Poveznice na cjeloviti tekst rada:

Pristup cjelovitom tekstu rada www.rehabend.unican.es

Citiraj ovu publikaciju:

Dvornik-Perhavec, Daniela; Vidaković, Držislav
Work performance as part of a determined system of a construction project // REHABEND 2020 – 8th Euro-American Congress on Construction Pathology, Rehabilitation Technology and Heritage Management, (2.1. Theoretical criteria of the intervention project.) / Lombillo, Ignacio ; Blanco, Haydee ; Boffill, Yosbel (ur.).
Granada: University of Cantabria, 2020. str. 1292-1303 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
Dvornik-Perhavec, D. & Vidaković, D. (2020) Work performance as part of a determined system of a construction project. U: Lombillo, I., Blanco, H. & Boffill, Y. (ur.)REHABEND 2020 – 8th Euro-American Congress on Construction Pathology, Rehabilitation Technology and Heritage Management, (2.1. Theoretical criteria of the intervention project.).
@article{article, author = {Dvornik-Perhavec, Daniela and Vidakovi\'{c}, Dr\v{z}islav}, year = {2020}, pages = {1292-1303}, keywords = {determined system, construction project, uncertainties, work performance}, isbn = {978-84-09-17871-1}, title = {Work performance as part of a determined system of a construction project}, keyword = {determined system, construction project, uncertainties, work performance}, publisher = {University of Cantabria}, publisherplace = {Granada, \v{S}panjolska} }
@article{article, author = {Dvornik-Perhavec, Daniela and Vidakovi\'{c}, Dr\v{z}islav}, year = {2020}, pages = {1292-1303}, keywords = {determined system, construction project, uncertainties, work performance}, isbn = {978-84-09-17871-1}, title = {Work performance as part of a determined system of a construction project}, keyword = {determined system, construction project, uncertainties, work performance}, publisher = {University of Cantabria}, publisherplace = {Granada, \v{S}panjolska} }




Contrast
Increase Font
Decrease Font
Dyslexic Font