Work performance as part of a determined system of a construction project
Work performance as part of a determined system of a construction project // REHABEND 2020 – 8th Euro-American Congress on Construction Pathology, Rehabilitation Technology and Heritage Management, (2.1. Theoretical criteria of the intervention project.) / Lombillo, Ignacio ; Blanco, Haydee ; Boffill, Yosbel (ur.).
Granada: University of Cantabria, 2020. str. 1292-1303 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 1094053 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Work performance as part of a determined system of
a construction project
(Work performance as part of a determined system
of a construction project)
Autori
Dvornik-Perhavec, Daniela ; Vidaković, Držislav
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
REHABEND 2020 – 8th Euro-American Congress on Construction Pathology, Rehabilitation Technology and Heritage Management, (2.1. Theoretical criteria of the intervention project.)
/ Lombillo, Ignacio ; Blanco, Haydee ; Boffill, Yosbel - Granada : University of Cantabria, 2020, 1292-1303
ISBN
978-84-09-17871-1
Skup
8th Euro-American Congress Construction Pathology, Rehabilitation Technology and Heritage Management
Mjesto i datum
Granada, Španjolska, 28.09.2020. - 30.09.2020
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
determined system, construction project, uncertainties, work performance
Sažetak
Every construction project is a system. It is determined with time, work quality and price. If one of these factor breaks, the investor suffers damage that affects the other system (for example sales, people who bought these buildings or flats, bank loans, and so on). Between the start (entry into the system) and the finish point (exit from the system) of the construction project are several solutions available. They are reflected in the economic, technical or time performance of the project. For the successful operation of the system, uncertainties must first be identified. Uncertainties arise from the non-systematic treatment of the project. It is necessary to eliminate them and ensure that the project is as determined as possible. Due to the structure of the project, we expect that the entire construction project is treated as a determined system (determined by the price, deadline, and quality of performed works). However, in the reconstruction of historical objects, we encounter other factors that influence the determination of the system and change it. It is influenced by the factors that the determined system changes into a stochastic system. The causes of the stochastic behavior of the system are when on a determined system involve external factors of a stochastic character or internal mechanisms, which are assumed as a stochastic and change in the system from unknown reasons. In this paper, we analyze the internal factors of work performance, which are important for construction quality, price, and deadline.