Pregled bibliografske jedinice broj: 1093954
System Adjustments Through Vector Organization and Technology
System Adjustments Through Vector Organization and Technology // Proceedings of the Creative Construction Conference 2019 / Skibniewski, Miroslaw J. ; Hajdu, Miklos (ur.).
Budimpešta, 2019. str. 440-445 doi:10.3311/CCC2019-061 (poster, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 1093954 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
System Adjustments Through Vector Organization and
Technology
(System Adjustments Through Vector Organization
and Technology)
Autori
Križaić, Vladimir
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Proceedings of the Creative Construction Conference 2019
/ Skibniewski, Miroslaw J. ; Hajdu, Miklos - Budimpešta, 2019, 440-445
ISBN
978-615-5270-56-7
Skup
Creative Construction Conference 2019
Mjesto i datum
Budimpešta, Mađarska, 29.06.2019. - 02.07.2019
Vrsta sudjelovanja
Poster
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
vector organization ; vector norm ; daily system adjustments ; BIM and DSP models ; organization differential
Sažetak
The production system is in the function of the organization and the technology of an implied system. The organization is the function of the structure and the flow, which in turn defines the unity of the arranged interrelated elements. The use of new technologies, especially the ones from the realms of computer science and cybernetics, and integrating them into the building industry technologies provides for enhancing the building industry business flow indices. The existing organization structure is thus to be supplemented with adjustment tool which is inevitable for systems and provides for business systems to feature the resources/days –based levels of control over projects. IIS technology has thus turned the matrix organization structure of the building industry into the vector one. The discrete norm elements should be replaced by the vector norm elements for the purpose of speeding up the technologic processes of planning and norm defining that are in turn the motors of companies providing for the deployment of he implied controls (system adjustment, that is) ; in other words, it means that the BIM business system – or the whole system as well- should be modeled. By means of further modeling and the BIM system simulations, there emerges the building industry business DSP model within the micro unit. The DSP method (dynamic structured programming) ) integrates the dynamic and the structu8red programming and provides – for the time being.-for a dynamic modeling of structures and the flow through the formula within the vector system ; as to the future, it will provide for defining the organization differential by means of iterating multidimensional model structure.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo, Interdisciplinarne tehničke znanosti