Project Planning by Modified Gauss S-Curve
Project Planning by Modified Gauss S-Curve // Proceedings of the Creative Construction e- Conference (2020) / Hajdu, Miklos ; Skibiniewski, Miroslaw J. (ur.).
Budimpešta: Dorpress, 2020. str. 65-70 doi:10.3311/CCC2020-047 (poster, međunarodna recenzija, cjeloviti rad (in extenso), ostalo)
CROSBI ID: 1093948 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Project Planning by Modified Gauss S-Curve
Autori
Križaić, Vladimir ; Hranj, Dražen
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), ostalo
Izvornik
Proceedings of the Creative Construction e- Conference (2020)
/ Hajdu, Miklos ; Skibiniewski, Miroslaw J. - Budimpešta : Dorpress, 2020, 65-70
ISBN
978-615-5270-61-1
Skup
Creative Construction e-Conference
Mjesto i datum
Opatija, Hrvatska, 28.06.2020. - 01.07.2020
Vrsta sudjelovanja
Poster
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
planning ; cash flow ; 3D modeling ; modified Gaussian S-curve ; optimization
Sažetak
Planning is the prediction of the future erfrmed most often by a gantt chart as a graphical representation of the activity with respect to the temporal abscissa component. In addition to the activity ordinates, there is also a cash-flow or S-curve given by the one- dimensional nonlinear equation. Today, there is a growing demand for two-dimensional or 3D modeling, including 3D planning through a vector cummulative S-curve. Monitoring the distribution of the situation on formerly realized projects creates an image of certain model behaviour of the 3D S-curve defined by the modified Gaussian curve. By developing fifteen project plans from the buildingconstruction industry and from the construction project through the Microsoft project, the discrete S-curve connects to the modified Gaussian S-curve (MGSC). Analyses are made that indicate the equivalence of the S- curves of plans and realization, which defines the function of the parameters λkv and b in the variable of investment amounts of projects. Therefore, modeling and simulating a new Gaussian curve-modified method creates an nM model for project development with the ability to optimize plans and an S-curve future projects and adjusting online technology.