Pregled bibliografske jedinice broj: 1086621
Method for Building Information Modeling Supported Project Control of Nearly Zero-Energy Building Delivery
Method for Building Information Modeling Supported Project Control of Nearly Zero-Energy Building Delivery // Energies, 13 (2020), 20; 5519, 21 doi:10.3390/en13205519 (međunarodna recenzija, članak, znanstveni)
CROSBI ID: 1086621 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Method for Building Information Modeling
Supported Project Control of Nearly Zero-Energy
Building Delivery
Autori
Gumbarević, Sanjin ; Burcar Dunović, Ivana ; Milovanović, Bojan ; Gaši, Mergim
Izvornik
Energies (1996-1073) 13
(2020), 20;
5519, 21
Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni
Ključne riječi
nearly zero-energy building ; building information modeling ; project delivery ; project control ; building energy modeling
Sažetak
With the increasing number of nearly zero- energy buildings (NZEB) due to increase of global awareness on climate change, the new concepts of design and control must be developed because of great NZEB dependency on detailing and multidisciplinary approach. This paper proposes a three-level gateway control method for NZEB project delivery by using digital representation of the building in building information modeling (BIM) environment. These controls (C1, C2 and C3) are introduced before three main phases of any project delivery—design phase, construction phase and handover. The proposed project control procedure uses black-box building energy modeling within the BIM environment, so the paper explores the reliability of one tool for direct energy modeling within the BIM- authoring software. The paper shows two types of validation tests with satisfactory results. This leads to conclusion that analyzed tool for energy simulation within BIM environment can be used in a way that is described in a proposed project control procedure. For further research it is proposed to explore reliability of tools for energy simulation connected to other BIM- authoring software, so this project control procedure could be independent of BIM-authoring software used in the paper.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo, Temeljne tehničke znanosti
POVEZANOST RADA
Ustanove:
Građevinski fakultet, Zagreb
Profili:
Ivana Burcar-Dunović
(autor)
Sanjin Gumbarević
(autor)
Bojan Milovanović
(autor)
Mergim Gaši
(autor)
Poveznice na cjeloviti tekst rada:
Pristup cjelovitom tekstu rada doi www.mdpi.com www.researchgate.netCitiraj ovu publikaciju:
Časopis indeksira:
- Current Contents Connect (CCC)
- Web of Science Core Collection (WoSCC)
- Science Citation Index Expanded (SCI-EXP)
- SCI-EXP, SSCI i/ili A&HCI
- Scopus