Pelješac bridge – design and maintenance // Future Trends in Civil Engineering / Mandić Ivanković, Ana ; Lakušić, Stjepan (ur.).
Zagreb, Hrvatska: Građevinski fakultet Sveučilišta u Zagrebu, 2019. str. 219-240 doi:10.5592/co/ftce.2019.10 (pozvano predavanje, međunarodna recenzija, cjeloviti rad (in extenso), stručni)
CROSBI ID: 1085883 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Pelješac bridge – design and maintenance
Autori
Pipenbaher, Marjan ; Hrelja Kovacevic, Gordana ; Petersic, Tatjana ; Mujkanovic, Nijaz
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), stručni
Izvornik
Future Trends in Civil Engineering
/ Mandić Ivanković, Ana ; Lakušić, Stjepan - : Građevinski fakultet Sveučilišta u Zagrebu, 2019, 219-240
ISBN
978-953-8168-36-9
Skup
Future Trends in Civil Engineering
Mjesto i datum
Zagreb, Hrvatska, 17.10.2020
Vrsta sudjelovanja
Pozvano predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
cable stayed bridge, extradosed bridge, steel box girder, steel driven piles, durability, maintenance
Sažetak
The Pelješac Bridge is currently the largest bridge under construction in Croatia, but also in the region. The construction began in July 2018 (for the second time), and the bridge should be completed in 36 months. The design of the bridge began in 2004. Through preliminary studies, preliminary designs and main designs the various types of bridges were considered. The bridge is located in the high-activity seismic zone with strong winds, extremely adverse foundation soil conditions and in aggressive maritime environment. The multi-span extradosed semi-integral bridge with steel deck was finally chosen for main design and construction. The history of design, the final design and the maintenance of the bridge will be presented in the paper.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo