Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 1079202

Predicting Buildings Construction Cost Overruns on the Basis of Cost Overruns Structure


Car-Pušić, Diana; Tijanić, Ksenija; Marović, Ivan; Mlađen, Marko
Predicting Buildings Construction Cost Overruns on the Basis of Cost Overruns Structure // Scientific Review and Environmental Sciences, 29 (2020), 3; 366-376 doi:10.22630/PNIKS.2020.29.3.31 (međunarodna recenzija, članak, znanstveni)


CROSBI ID: 1079202 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Predicting Buildings Construction Cost Overruns on the Basis of Cost Overruns Structure

Autori
Car-Pušić, Diana ; Tijanić, Ksenija ; Marović, Ivan ; Mlađen, Marko

Izvornik
Scientific Review and Environmental Sciences (1732-9353) 29 (2020), 3; 366-376

Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni

Ključne riječi
cost overrun ; quantities of works ; unforeseen works ; additional works ; linear regression analysis ; soft computing methods

Sažetak
In construction practice, contractually agreed costs are often exceeded, which interferes with the sustainable realization of construction projects. The research described in this paper covers 24 new construction, renovation and reconstruction projects in the Republic of Croatia realized in the years 2006 to 2017, in order to analyze the occurrence of cost overruns more precisely with regard to the source of the overruns. It was found that additional work is the main source of cost overruns: firstly, additional work as a result of the client's change orders and then unforeseen construction work as a result of unforeseen circumstances. As for the additional works, they are carried out at the client's request and are not necessary for the safety and stability of the building. Using linear regression and "soft computing" methods, the possibility of modeling the relationship between contractually agreed and realized construction costs with satisfactory accuracy was tested. The model with the values of the natural logarithms of the variables, modeled according to the "time-cost" model of Bromilow, proved to be of the highest accuracy.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo, Projektni menadžment



POVEZANOST RADA


Ustanove:
Građevinski fakultet, Rijeka

Poveznice na cjeloviti tekst rada:

doi iks.pn.sggw.pl

Citiraj ovu publikaciju:

Car-Pušić, Diana; Tijanić, Ksenija; Marović, Ivan; Mlađen, Marko
Predicting Buildings Construction Cost Overruns on the Basis of Cost Overruns Structure // Scientific Review and Environmental Sciences, 29 (2020), 3; 366-376 doi:10.22630/PNIKS.2020.29.3.31 (međunarodna recenzija, članak, znanstveni)
Car-Pušić, D., Tijanić, K., Marović, I. & Mlađen, M. (2020) Predicting Buildings Construction Cost Overruns on the Basis of Cost Overruns Structure. Scientific Review and Environmental Sciences, 29 (3), 366-376 doi:10.22630/PNIKS.2020.29.3.31.
@article{article, author = {Car-Pu\v{s}i\'{c}, Diana and Tijani\'{c}, Ksenija and Marovi\'{c}, Ivan and Mla\djen, Marko}, year = {2020}, pages = {366-376}, DOI = {10.22630/PNIKS.2020.29.3.31}, keywords = {cost overrun, quantities of works, unforeseen works, additional works, linear regression analysis, soft computing methods}, journal = {Scientific Review and Environmental Sciences}, doi = {10.22630/PNIKS.2020.29.3.31}, volume = {29}, number = {3}, issn = {1732-9353}, title = {Predicting Buildings Construction Cost Overruns on the Basis of Cost Overruns Structure}, keyword = {cost overrun, quantities of works, unforeseen works, additional works, linear regression analysis, soft computing methods} }
@article{article, author = {Car-Pu\v{s}i\'{c}, Diana and Tijani\'{c}, Ksenija and Marovi\'{c}, Ivan and Mla\djen, Marko}, year = {2020}, pages = {366-376}, DOI = {10.22630/PNIKS.2020.29.3.31}, keywords = {cost overrun, quantities of works, unforeseen works, additional works, linear regression analysis, soft computing methods}, journal = {Scientific Review and Environmental Sciences}, doi = {10.22630/PNIKS.2020.29.3.31}, volume = {29}, number = {3}, issn = {1732-9353}, title = {Predicting Buildings Construction Cost Overruns on the Basis of Cost Overruns Structure}, keyword = {cost overrun, quantities of works, unforeseen works, additional works, linear regression analysis, soft computing methods} }

Časopis indeksira:


  • Scopus


Citati:





    Contrast
    Increase Font
    Decrease Font
    Dyslexic Font