Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 1058784

A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling


Dasović, Borna; Galić, Mario; Klanšek, Uroš
A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling // Sustainability, 12 (2020), 8; 3405, 18 doi:.org/10.3390/su12083405 (međunarodna recenzija, članak, znanstveni)


CROSBI ID: 1058784 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling

Autori
Dasović, Borna ; Galić, Mario ; Klanšek, Uroš

Izvornik
Sustainability (2071-1050) 12 (2020), 8; 3405, 18

Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni

Ključne riječi
sustainable scheduling ; construction execution ; optimization ; project management tools ; software integration ; building information modeling ; BIM

Sažetak
Construction scheduling, in practice, commonly relies on the usage of commercial project management tools (PMT) without specific optimization features. To obtain optimal schedules, planners often need to develop separate optimization models with special tools, which, however, demand further processing and editing of optimization results by PMT into forms expected for project management. In this regard, separation of optimization and PMT also requires considerable additional work for complete and harmonized updating of schedules during construction execution. Mentioned drawbacks and lack of available time may take to deficient construction scheduling during the implementation phase resulting in poor or even insufficient realization of project goals. Therefore, this paper presents an achievements survey on the integration of optimization and PMT that allow sustainable construction scheduling, particularly in terms of continuous optimal time and resource allocation throughout the project life cycle. Such work has not yet been comprehensively done up to now and the present contribution intends to fill a literature gap in the aforesaid area. Following a brief introduction, the optimization platform for construction scheduling is given in the article. Focusing on construction scheduling, an in-depth achievements survey on the integration of heuristics methods, mathematical programming and special solving methods with conventional PMT as well as optimization-based building information modeling (BIM) tools is then performed and findings are reported. The paper ends with conclusions and recommendations for further research.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Ustanove:
Građevinski i arhitektonski fakultet Osijek,
Sveučilište J. J. Strossmayera u Osijeku

Profili:

Avatar Url Mario Galić (autor)

Poveznice na cjeloviti tekst rada:

doi www.mdpi.com

Citiraj ovu publikaciju:

Dasović, Borna; Galić, Mario; Klanšek, Uroš
A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling // Sustainability, 12 (2020), 8; 3405, 18 doi:.org/10.3390/su12083405 (međunarodna recenzija, članak, znanstveni)
Dasović, B., Galić, M. & Klanšek, U. (2020) A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling. Sustainability, 12 (8), 3405, 18 doi:.org/10.3390/su12083405.
@article{article, author = {Dasovi\'{c}, Borna and Gali\'{c}, Mario and Klan\v{s}ek, Uro\v{s}}, year = {2020}, pages = {18}, DOI = {doi.org/10.3390/su12083405}, chapter = {3405}, keywords = {sustainable scheduling, construction execution, optimization, project management tools, software integration, building information modeling, BIM}, journal = {Sustainability}, doi = {doi.org/10.3390/su12083405}, volume = {12}, number = {8}, issn = {2071-1050}, title = {A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling}, keyword = {sustainable scheduling, construction execution, optimization, project management tools, software integration, building information modeling, BIM}, chapternumber = {3405} }
@article{article, author = {Dasovi\'{c}, Borna and Gali\'{c}, Mario and Klan\v{s}ek, Uro\v{s}}, year = {2020}, pages = {18}, DOI = {doi.org/10.3390/su12083405}, chapter = {3405}, keywords = {sustainable scheduling, construction execution, optimization, project management tools, software integration, building information modeling, BIM}, journal = {Sustainability}, doi = {doi.org/10.3390/su12083405}, volume = {12}, number = {8}, issn = {2071-1050}, title = {A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling}, keyword = {sustainable scheduling, construction execution, optimization, project management tools, software integration, building information modeling, BIM}, chapternumber = {3405} }

Časopis indeksira:


  • Current Contents Connect (CCC)
  • Web of Science Core Collection (WoSCC)
    • Science Citation Index Expanded (SCI-EXP)
    • Social Science Citation Index (SSCI)
    • SCI-EXP, SSCI i/ili A&HCI
  • Scopus


Citati:





    Contrast
    Increase Font
    Decrease Font
    Dyslexic Font