LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time
LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time // TransNav, 14 (2020), 39-42 doi:10.12716/1001.14.01.03 (međunarodna recenzija, članak, znanstveni)
CROSBI ID: 1037555 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
LNG Carrier Main Steam Turbine Reliability in the
Exploatation Period of Time
Autori
Poljak, Igor ; Orović, Josip ; Knežević, Vlatko ; Mrzljak, Vedran
Izvornik
TransNav (2083-6473) 14
(2020);
39-42
Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni
Ključne riječi
Engine Room Maintenance ; LNG Carrier ; Steam Turbine ; Exploatation, Exploatation Period of Time ; Main Steam Turbine ; Main Propulsion Turbine ; Reliability
Sažetak
In this paper the LNG carrier with steam turbine propulsion plant maintenance records has been analysed. Actual observed data from the ship, built in 2001, are from ship maintenance history data from September 2002 until August 2010. During the analysed period, main propulsion turbine had one major failure and several minor failures. The ship had three dry docks and one was prolonged due to increased requirements for cargo transport. Total running hours of the main propulsion turbine in the observed period of time were 63204 hours. The list of failures and influence of each mentioned failure of main turbine propulsion machinery is discussed and analysed in respect to the propulsion autonomy of the vessel.
Izvorni jezik
Engleski
Znanstvena područja
Strojarstvo, Tehnologija prometa i transport
POVEZANOST RADA
Ustanove:
Tehnički fakultet, Rijeka,
Sveučilište u Zadru
Citiraj ovu publikaciju:
Časopis indeksira:
- Web of Science Core Collection (WoSCC)
- Emerging Sources Citation Index (ESCI)
- Scopus