Analysis of the construction machinery work efficiency as a factor of the earthworks sustainability
Analysis of the construction machinery work efficiency as a factor of the earthworks sustainability // IOP Conference Series: Earth and Environmental Science
Brno, Češka Republika: IOP Publishing, 2019. 012009, 12 doi:10.1088/1755-1315/222/1/012009 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 980909 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Analysis of the construction machinery work
efficiency as a factor of the earthworks
sustainability
Autori
Tijanić, Ksenija ; Šopić, Martina ; Marović, Ivan ; Car-Pušić, Diana
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
IOP Conference Series: Earth and Environmental Science
/ - : IOP Publishing, 2019
Skup
International Scientific Conference "People, Buildings and Environment 2018 (PBE)
Mjesto i datum
Brno, Češka Republika, 17.10.2018. - 19.10.2018
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
construction machinery ; work efficiency ; sustainability
Sažetak
Being aware of the construction machinery work efficiency is one of the key conditions of dynamic planning of machine work at the construction site and it can be considered as one of the earthworks sustainability factors. The main topic of this paper is the time study analysis of one standard technological cyclic construction machine process (the excavators’ loading the transportation vehicle), which was observed on-and-off site and analysed. On-site data was obtained by snapback chronometry method with the purpose of determining actual work efficiency ; while the (off-site) planned work efficiency was determined using the standardized tables. The aim was to determine the existence of a deviation and examine the differences between planned and actual work efficiency of particular technological process in earthworks as well as to identify its cost- effective area as a prerequisite for identifying the earthworks sustainability. As the earthworks sustainability is the synthesis and concordance of beneficial activities for technological, economic, environmental and social performance context, the balance of excavators’ work efficiency is needed. It was concluded that in order to achieve sustainability, i.e. to be in cost-effective area, the maximum value of excavators’ cycle time extends up to 50 seconds.
Izvorni jezik
Engleski
Znanstvena područja
Građevinarstvo, Interdisciplinarne tehničke znanosti
POVEZANOST RADA
Ustanove:
Građevinski fakultet, Rijeka
Profili:
Martina Šopić
(autor)
Ksenija Tijanić Štrok
(autor)
Ivan Marović
(autor)
Diana Car-Pušić
(autor)
Citiraj ovu publikaciju:
Časopis indeksira:
- Web of Science Core Collection (WoSCC)
- Conference Proceedings Citation Index - Science (CPCI-S)
- Conference Proceedings Citation Index - Social Sciences & Humanities (CPCI-SSH)
- Scopus