Pregled bibliografske jedinice broj: 790036
Transformation of Advanced Contract Types for the Shipbuilding Industry with Risk Analysis
Transformation of Advanced Contract Types for the Shipbuilding Industry with Risk Analysis // Brodogradnja, 65 (2014), 4; 53-64 (međunarodna recenzija, članak, znanstveni)
CROSBI ID: 790036 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Transformation of Advanced Contract Types for the Shipbuilding Industry with Risk Analysis
Autori
Kolić, Damir ; Storch, Richard Lee ; Fafandjel, Nikša
Izvornik
Brodogradnja (0007-215X) 65
(2014), 4;
53-64
Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni
Ključne riječi
shipbuilding contracts; risk analysis; product work breakdown structure; Monte Carlo simulation
Sažetak
Many shipyards today contract vessels based on the traditional Lump Sum Fixed Price (LSFP) contract. Even though the construction of vessels from contract to delivery lasts from a year to longer, there are limited mechanisms available to mitigate for risk during the project evolution, especially in the case of prototype vessels, which are being built by the shipyard for the first time and include much uncertainty with regards to project drawings, detailed material lists and man-hours. Shipbuilding is definitely a large engineering construction project (LECP). Therefore it is logical to analyse how LECPs are contracted and managed in other industries which successfully minimize contract risk and constantly ensure profit in its business. In this paper two new shipbuilding-contracting models are presented and applied in a generic case study of contracting the newbuilding of a prototype vessel. The Cost Plus Incentive Fee (CPIF) and the Cost Plus Fixed Fee (CPFF) contract models are demonstrated as improving the contracting process while yielding positive results for production, both in relation to the core capabilities of the shipyard as well as the sub-contracted activities in vessel production. Likewise a product work breakdown structure PWBS is shown as the model for shipyard business that very well complements the advanced contracting models. Finally a new contract risk analysis method using Monte Carlo simulation is developed to show how to practically analyse and compare the contracting methods in a case study so that shipyard management could choose the contracting model with the least amount of risk.
Izvorni jezik
Engleski
Znanstvena područja
Brodogradnja, Strojarstvo
POVEZANOST RADA
Ustanove:
Tehnički fakultet, Rijeka
Citiraj ovu publikaciju:
Časopis indeksira:
- Web of Science Core Collection (WoSCC)
- Science Citation Index Expanded (SCI-EXP)
- SCI-EXP, SSCI i/ili A&HCI
- Scopus