Pregled bibliografske jedinice broj: 784389
Targeting of Trade-Off for Total Site Heat Recovery
Targeting of Trade-Off for Total Site Heat Recovery // Digital Proceedings of the 10th Conference on Sustainable Development of Energy, Water and Environment Systems - SDEWES / Ban, Marko et al. (ur.).
Zagreb: Fakultet strojarstva i brodogradnje Sveučilišta u Zagrebu, 2015. (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
CROSBI ID: 784389 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Targeting of Trade-Off for Total Site Heat Recovery
Autori
Boldyryev, Stanislav ; Krajačić Goran
Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni
Izvornik
Digital Proceedings of the 10th Conference on Sustainable Development of Energy, Water and Environment Systems - SDEWES
/ Ban, Marko et al. - Zagreb : Fakultet strojarstva i brodogradnje Sveučilišta u Zagrebu, 2015
Skup
10th Conference on Sustainable Development of Energy, Water and Environment Systems - SDEWES
Mjesto i datum
Dubrovnik, Hrvatska, 27.09.2015. - 02.10.2015
Vrsta sudjelovanja
Predavanje
Vrsta recenzije
Međunarodna recenzija
Ključne riječi
Total Site Analysis; Heat Integration; Energy Efficiency; Industrial Application
Sažetak
This paper deals with selection of optimum amount heat to be recovered during Total Site integration and utility targets for external heating, cooling, refrigerating etc. The methodology provides the calculation of minimum capital investment during heat integration of industrial site. It uses heat transfer area targets, utility distribution with overall cost of retrofit. Heat transfer area is calculated for different regions with use of intermediate utility and direct heating and cooling. Minimal temperature difference between Total Site profiles is analysed. Minimum of total heat transfer area for Total Site recovery is calculated for array of minimal temperature differences. The utility consumption, numbers of units and material of equipment are analysed too and minimum total cost for retrofit project of site recovery system is calculated. The case study shows heat recovery improvement on 1.94 MW. Site heating demands is reduced on 37.3% and cooling capacity reduction is 39.6%. The implementation of retrofit 777, 474 Euro and payback time is 11.96 months.
Izvorni jezik
Engleski
Znanstvena područja
Kemijsko inženjerstvo, Strojarstvo
POVEZANOST RADA
Projekti:
120-1201918-1920 - Racionalno skladištenje energije za održivi razvoj energetike (Duić, Neven, MZOS ) ( CroRIS)
Ustanove:
Fakultet strojarstva i brodogradnje, Zagreb