Prioritization procedure for the power transmission lines and transformers revitalization
Prioritization procedure for the power transmission lines and transformers revitalization // International review of civil engineering, 3 (2008), 5; 768-778 (međunarodna recenzija, članak, znanstveni)
CROSBI ID: 386473 Za ispravke kontaktirajte CROSBI podršku putem web obrasca
Naslov
Prioritization procedure for the power transmission lines and transformers revitalization
Autori
Bajs, Davor ; Majstrović, Goran ; Medić, Ivan
Izvornik
International review of civil engineering (2036-9913) 3
(2008), 5;
768-778
Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni
Ključne riječi
System reliability and security; Transmission assets; Revitalization; Prioritization
Sažetak
Important issue for the Transmission System Operators is how to deal with older transmission assets. To ensure system reliability and security over a long time frame, Transmission System Operators should develop appropriate methodology and procedure for the power transmission assets revitalization or replacement. This paper describes one approach to prioritize transmission lines and transformers for revitalization according to the predefined criteria based on an asset condition and its importance within a power system. Example of the prioritization procedure is given in the paper.
Izvorni jezik
Engleski
Znanstvena područja
Elektrotehnika
POVEZANOST RADA
Projekti:
201-2012299-2300 - Neizvjesnosti i rizici u planiranju elektroenergetskih mreža
Ustanove:
Energetski institut
Citiraj ovu publikaciju:
Časopis indeksira:
- Web of Science Core Collection (WoSCC)
- Science Citation Index Expanded (SCI-EXP)
- SCI-EXP, SSCI i/ili A&HCI
- Scopus