Pretražite po imenu i prezimenu autora, mentora, urednika, prevoditelja

Napredna pretraga

Pregled bibliografske jedinice broj: 1016185

Determining of risk ranking for Otok Virje – Brezje levee reconstruction


Librić, L; Kovačević, M.S.; Ivoš, G.
Determining of risk ranking for Otok Virje – Brezje levee reconstruction // ICONHIC2019-proceedings
Khania, Grčka, 2019. 170, 8 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)


CROSBI ID: 1016185 Za ispravke kontaktirajte CROSBI podršku putem web obrasca

Naslov
Determining of risk ranking for Otok Virje – Brezje levee reconstruction

Autori
Librić, L ; Kovačević, M.S. ; Ivoš, G.

Vrsta, podvrsta i kategorija rada
Radovi u zbornicima skupova, cjeloviti rad (in extenso), znanstveni

Izvornik
ICONHIC2019-proceedings / - , 2019

Skup
2nd International Conference on Natural Hazards & Infrastructure ( ICONHIC 2019)

Mjesto i datum
Khania, Grčka, 23.06.2019. - 26.06.2019

Vrsta sudjelovanja
Predavanje

Vrsta recenzije
Međunarodna recenzija

Ključne riječi
levee, risk prirorities, ANP, decision making

Sažetak
The Drava River levee was constructed in 1968. It protects the town of Otok Virje and approx. 450 ha of agricultural land, forests and other land from flooding. Its total length is 3711 meters. The large flood wave which moved from Austria through Slovenia to Croatia at the beginning of November 2012, created openings and caused a breach in Otok Virje – Brezje levee. As the maximum water level of the flood wave at places exceeded the embankment crown, the result was overtopping in the right levee longer than 1000 metres followed by breaching of embankment in length of 50 m. The flood hit 3 neighbouring towns, where 90 houses were flooded, and the total flooded area equalled approx. 6, 5 km2. This paper presents the methodology for risk assessment in reconstruction of Otok Virje – Brezje levee. For assessing the risks, the Analytic Network Process (ANP) was applied. The result is a list of risk priorities. Depending on the position a risk occupies in the list, appropriate resources will be used as the expected response to the risk. The network model resulted in a more stable decision-making process and greater adaptation to real life situations and to reasonable expectations.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Ustanove:
Građevinski fakultet, Zagreb

Poveznice na cjeloviti tekst rada:

Pristup cjelovitom tekstu rada

Citiraj ovu publikaciju:

Librić, L; Kovačević, M.S.; Ivoš, G.
Determining of risk ranking for Otok Virje – Brezje levee reconstruction // ICONHIC2019-proceedings
Khania, Grčka, 2019. 170, 8 (predavanje, međunarodna recenzija, cjeloviti rad (in extenso), znanstveni)
Librić, L., Kovačević, M. & Ivoš, G. (2019) Determining of risk ranking for Otok Virje – Brezje levee reconstruction. U: ICONHIC2019-proceedings.
@article{article, author = {Libri\'{c}, L and Kova\v{c}evi\'{c}, M.S. and Ivo\v{s}, G.}, year = {2019}, pages = {8}, chapter = {170}, keywords = {levee, risk prirorities, ANP, decision making}, title = {Determining of risk ranking for Otok Virje – Brezje levee reconstruction}, keyword = {levee, risk prirorities, ANP, decision making}, publisherplace = {Khania, Gr\v{c}ka}, chapternumber = {170} }
@article{article, author = {Libri\'{c}, L and Kova\v{c}evi\'{c}, M.S. and Ivo\v{s}, G.}, year = {2019}, pages = {8}, chapter = {170}, keywords = {levee, risk prirorities, ANP, decision making}, title = {Determining of risk ranking for Otok Virje – Brezje levee reconstruction}, keyword = {levee, risk prirorities, ANP, decision making}, publisherplace = {Khania, Gr\v{c}ka}, chapternumber = {170} }




Contrast
Increase Font
Decrease Font
Dyslexic Font