The optimization of time and cost process technique (CROSBI ID 253877)
Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Barković, Dražen ; Jukić, Josip
engleski
The optimization of time and cost process technique
Th e critical path method (CPM) and linear programming are two closely related operations research techniques. Some of their concepts are presented in this paper in order to review some recent modelling structures that have been particularly valuable in the analysis of project time-cost crashes problems. Th e activities underwent crashing of both the time and cost using linear programming. A simplifi ed representation of a small project and a linear programming model were formulated to represent this system. In addition to being simple, the advantage of this method is that it is applicable to large networks. It allows for a shorter computational time at a lower cost, whereas robustness is increased
Critical path method, linear programming, time crashing, maintenance
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o izdanju
Povezanost rada
nije evidentirano