Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

The optimization of time and cost process technique (CROSBI ID 253877)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Barković, Dražen ; Jukić, Josip The optimization of time and cost process technique // Ekonomski vjesnik, 17/2 (2017), 287-300

Podaci o odgovornosti

Barković, Dražen ; Jukić, Josip

engleski

The optimization of time and cost process technique

Th e critical path method (CPM) and linear programming are two closely related operations research techniques. Some of their concepts are presented in this paper in order to review some recent modelling structures that have been particularly valuable in the analysis of project time-cost crashes problems. Th e activities underwent crashing of both the time and cost using linear programming. A simplifi ed representation of a small project and a linear programming model were formulated to represent this system. In addition to being simple, the advantage of this method is that it is applicable to large networks. It allows for a shorter computational time at a lower cost, whereas robustness is increased

Critical path method, linear programming, time crashing, maintenance

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

17/2

2017.

287-300

objavljeno

0353-359X

1847-2206

Povezanost rada

nije evidentirano

Indeksiranost