Study of the Hydropower Potential for Construction of Small Hydropower Plant. Study Case: “Prizreni 4”, Kosovo (CROSBI ID 664469)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Lajqi, Shpetim ; Đurin, Bojan ; Lajqi, Naser ; Meha, Drilon ; Baić, Lucija Study of the Hydropower Potential for Construction of Small Hydropower Plant. Study Case: “Prizreni 4”, Kosovo // The 8th International Conference & Workshop REMOO Venice/Italy 29-31 May, Energy for Tomorrow. Erlagen: Verlag e.K., 2018. str. 65-81

Podaci o odgovornosti

Lajqi, Shpetim ; Đurin, Bojan ; Lajqi, Naser ; Meha, Drilon ; Baić, Lucija

engleski

Study of the Hydropower Potential for Construction of Small Hydropower Plant. Study Case: “Prizreni 4”, Kosovo

Improving the quality of living has increased the need for sustainable energy production at the lowest price, due to the sustainability of the environment and at thesame time with the highest efficiency of energy used. For the industrialized society, meeting of the energy requirements and reducing of the global warming can be achieved by increasing the energy efficiency and with the use of renewable energy sources. The study of the hydropower potential of the river “Lumëbardhi i Prizrenit”, located in the Republic of Kosovo was motivation for the designing and construction of Small Hydro Power Plant “Prizreni 4”, in order to reduce using of the coal. The current paper is focused on water resources of the river basin of “Lumëbardhi i Prizrenit” with their respect to the hydrological and meteorological conditions, the topography of the terrain and determination of the water intake in the village of Reçan, Municipality of Prizren. The study of the hydropower potential of the river “Lumëbardhi i Prizrenit” takes into account many factors, i.e. water flows from different water sources, precipitation of rainfall and snow, sustainability of water flow etc, in order to justify the construction of the Small Hydro Power Plant “Prizreni 4”. Paper also presents the determination of ecological flow, by analyzing and comparing several legislation methods between the Republic of Kosovo, Croatia, Slovenia, Switzerland etc.

Sustainable energy ; Hydropower potential ; Lumëbardhi i Prizrenit ; Small Hydropower Plant “Prizreni 4”, Kosovo

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

65-81.

2018.

objavljeno

Podaci o matičnoj publikaciji

The 8th International Conference & Workshop REMOO Venice/Italy 29-31 May, Energy for Tomorrow

Erlagen: Verlag e.K.

978-3-9818275-8-3

Podaci o skupu

REMOO International Conference

predavanje

29.05.2018-31.05.2018

Venecija, Italija

Povezanost rada

Elektrotehnika, Građevinarstvo, Strojarstvo