Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

Analytical solution of the serial Bernoulli production line steady-state performance and its application in the shipbuilding process (CROSBI ID 253317)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Hadžić, Neven Analytical solution of the serial Bernoulli production line steady-state performance and its application in the shipbuilding process // International journal of production research, 56 (2018), 12; 1, 14. doi: 10.1080/00207543.2018.1500042

Podaci o odgovornosti

Hadžić, Neven

engleski

Analytical solution of the serial Bernoulli production line steady-state performance and its application in the shipbuilding process

The modern shipbuilding industry is faced with numerous challenges urging abiding improvement of the shipbuilding process and its management. Such a demanding problem is usually approached using complex production management models involving large data basis handling. The same problem can be solved using simpler, intuitive and mathematically transparent models developed within production system engineering. For these purposes, the analytical solution of the serial Bernoulli production line steady-state performance involving an arbitrary number of machines and buffers of arbitrary occupancy is developed based on Markov chain approach and eigenvalue problem including formulation of the generalised transition matrix as a key novelty. Performance measures in case of general serial Bernoulli production line are developed and the theory is validated using serial Bernoulli lines composed of two, three, four and five machines. The obtained results are compared to those determined using a semi-analytical approach. In order to further demonstrate the applicability of the developed theory, performance measure analysis is performed in cases of longer lines composed of 6, 7, 8, 9 and 10 machines with non-equal buffer capacities. Application of the developed procedure in the analysis of the shipbuilding process is illustrated in a case of the plate prefabrication line usually placed in each shipyard.

Shipbuilding ; production system engineering ; Bernoulli production line ; steady-state performance ; analytical solution

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

56 (12)

2018.

1

14

objavljeno

0020-7543

1366-588X

10.1080/00207543.2018.1500042

Povezanost rada

Brodogradnja, Strojarstvo

Poveznice
Indeksiranost