Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

AN INTEGRATED APPROACH TO PRODUCTION SCHEDULING AND MATERIAL REQUIREMENTS PLANNING (CROSBI ID 485584)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Matičević, Gordana ; Lujić, Roberto AN INTEGRATED APPROACH TO PRODUCTION SCHEDULING AND MATERIAL REQUIREMENTS PLANNING // CIM 2001. Lumbarda, 2001. str. III-037 - III-04-x

Podaci o odgovornosti

Matičević, Gordana ; Lujić, Roberto

engleski

AN INTEGRATED APPROACH TO PRODUCTION SCHEDULING AND MATERIAL REQUIREMENTS PLANNING

The paper presents an integrated production planning and monitoring system based on MRP/MRP II and just in time principles, which is part of Management Information System (MIS). MIS has been developed at Mechanical Engineering Faculty in Slavonski Brod. All activities are coordinated by master plan through forward and backward scheduling. MIS gives accurate and up-to date information that is necessary for making decisions. System MIS is applicable for single ; changeable market demands or makes to order production.

production planning and monitoring; material requirement planning; scheduling; single production

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

III-037 - III-04-x.

2001.

objavljeno

Podaci o matičnoj publikaciji

CIM 2001

Lumbarda:

Podaci o skupu

7th International Scientific Conference on Production Engineering

predavanje

14.06.2001-15.06.2001

Lumbarda, Hrvatska

Povezanost rada

Strojarstvo