Accuracy of Cutting the Tunnel "Mala Kapela" in Croatia (CROSBI ID 642632)
Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Zrinjski, Mladen ; Barković, Đuro ; Majcan, Tomislav
engleski
Accuracy of Cutting the Tunnel "Mala Kapela" in Croatia
The tunnel "Mala Kapela", 5760 m long, is the longest tunnel in the Republic of Croatia. The transverse deviation for the cutting point in the right tunnel tube was sQ=0.8 cm and the longitudinal deviation sL=2.1 cm. The transverse deviation for the cutting point in the left tunnel tube was sQ=1.0 cm and the longitudinal deviation sL=2.2 cm. The vertical deviation for the cutting point in the right tunnel tube was sH=1.9 cm, and for the cutting point in the left tunnel tube sH=2.1 cm.
overhead geodetic basis; underground geodetic basis; transverse deviation; longitudinal deviation; vertical deviation
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
451-457.
2015.
objavljeno
Podaci o matičnoj publikaciji
Conference Proceedings, International Conference Contemporary Achievements in Civil Engineering 2015
Bešević, Miroslav
Subotica: University of Novi Sad – Faculty of Civil Engineering Subotica
978-86-80297-62-0
Podaci o skupu
International Conference Contemporary Achievements in Civil Engineering 2015
predavanje
24.04.2015-24.04.2015
Subotica, Srbija