Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

Concrete Spent Fuel Cask Criticality Calculation (CROSBI ID 465269)

Prilog sa skupa u zborniku | izvorni znanstveni rad

Božić, Helena ; Baće, Mile ; Grgić, Davor Concrete Spent Fuel Cask Criticality Calculation // Nuclear Option in Countries with Small and Medium Electricity Grid / Knapp, Vladimir ; Čavlina, Nikola (ur.). Hrvatsko nuklearno društvo, 1996. str. 471-477-x

Podaci o odgovornosti

Božić, Helena ; Baće, Mile ; Grgić, Davor

engleski

Concrete Spent Fuel Cask Criticality Calculation

A preliminary analysis of the concrete cask for the intermediate dry storage of the spent fuel of NPP Krško should include an estimation of the effective multiplication factor Assuming 16x16 fuel elements, 4.3% initial enrichment, 45 GWd/tU burnup and 10 years cooling time, a concrete spent fuel cask capacity of10 spent fuel assemblies is proposed. Fuel assemblies are placed inside inner catty in a "basket" - a boron (1%) doped steel structure Heavy concrete (25% Fe), 45 cm thick, is enclosed in a carbon steel shell. There is also a stainless steel (SS304) lining of the storage cavity Isotope inventory of the spent fuel after a 10 years cooling time is calculated using OFIIGEN-S functional module of the SCALE-4.2 code package The effective multiplication factor k_eff of dry (helium filled) and wet (water filled) cask for fresh and used fuel is calculated using CSAS4 Monte Carlo method based control module of the same SCALE-4.2 code package. The obtained results of k_eff of the dry cask for fresh and spent fuel are well below the required 0 95 value, but those for the water filled cask are above this value. Therefore, several additional calculations of the k_eff varying the thickness of a boral basket structure which had replaced the stainless steel one were done It tumed out that at least a 1.5 cm thick boral wall was needed to meet the required 0.95 value for k_eff.

spent fuel cask; criticality; dry storage

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

471-477-x.

1996.

objavljeno

Podaci o matičnoj publikaciji

Nuclear Option in Countries with Small and Medium Electricity Grid

Knapp, Vladimir ; Čavlina, Nikola

Hrvatsko nuklearno društvo

Podaci o skupu

International Conference: Nuclear Option in Countries with Small and Medium Electricity Grid

poster

07.10.1996-09.10.1996

Opatija, Hrvatska

Povezanost rada

Elektrotehnika