RELAP5/mod2 Analysis of Inadvertent Closing of the Main Steam Isolation Valve in NPP Krško (CROSBI ID 465266)
Prilog sa skupa u zborniku | izvorni znanstveni rad
Podaci o odgovornosti
Čavlina, Nikola ; Debrecin, Nenad ; Grgić, Davor ; Aralica, Marin
engleski
RELAP5/mod2 Analysis of Inadvertent Closing of the Main Steam Isolation Valve in NPP Krško
The paper describes the use of system code RELAP5/mod2 in analysis of inadvertent closing of the main steam isolation valve that happened in NPP Krško on September, 25 1995. Three cases were calculated in order to address different aspects of the modelled transient. This preliminary calculation shows that, even though the real plant behaviour isnt completely reproduced, such kind of analysis can help to better understand plant behaviour and to identify important phenomena in the plant during transient. The result of the calculation for the case no. 3, indicates that, with better understanding of status of the plant systems, calculated results could be very similar to the plant data.
NPP safety; transient analyses; MSIV closure
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
447-455-x.
1996.
objavljeno
Podaci o matičnoj publikaciji
Nuclear Option in Countries with Small and Medium Electricity Grid
Knapp, Vladimir ; Čavlina, Nikola
Hrvatsko nuklearno društvo
Podaci o skupu
International Conference: Nuclear Option in Countries with Small and Medium Electricity Grid
poster
07.10.1996-09.10.1996
Opatija, Hrvatska