Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

Equalization of stress distribution on threaded connection optimizing pitch geometry (CROSBI ID 640700)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Simunovic, V. ; Kozak, D. ; Ivandic, Z. Equalization of stress distribution on threaded connection optimizing pitch geometry // Proceedings of the 8th International Scientific and Expert Conference TEAM 2016 / Maronek, Milan ; Barta Jozef (ur.). Trnava: Alumni Press, 2016. str. 136-140

Podaci o odgovornosti

Simunovic, V. ; Kozak, D. ; Ivandic, Z.

engleski

Equalization of stress distribution on threaded connection optimizing pitch geometry

This paper presents an analysis and optimization of stress distribution on a screw connection with ISO metric thread. According to previous measurements, which were performed in the application, it was shown that the profile teeth at the joint are unequally burdened. The task is to generally show screw connections, make a CAD parametric model of the joint, analyse the distribution of stresses and optimize it by changing or more precisely, increasing the pitch of the nut. Also it is necessary to compare the behaviour of the classical and optimized screw connection and create a table of optimized pitch solutions. The performed FEM analysis presented the stress state of the classic screw connection on the selected example of thread M16. It shows and confirms the classic behaviour on bolted joints where the first profiles in contact transfers most of the load while other are much less burdened. The assumption is that the increase of nut pitch or more specifically the existence of certain positive difference between the pitch of the nuts and bolt, the classical behaviour of bolted joints can be improved. This was done and it led to a reduction of the maximum von Mises stress for roughly 30%. In this way, stress distribution and fatigue life of bolted joints has improved. By specifying the corrected pitch size for threads of general application, presented in the work in tables, it is to be concluded that the method is more appropriate for larger nominal diameter of the threads. Sizes of pitch difference, which are quite small, ascend with the increase in nominal diameter and thus acquire sizes that are easier and cheaper to implement.

pitch optimizing ; threaded connection ; stress distribution

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

136-140.

2016.

nije evidentirano

objavljeno

978-80-8096-237-1

Podaci o matičnoj publikaciji

Proceedings of the 8th International Scientific and Expert Conference TEAM 2016

Maronek, Milan ; Barta Jozef

Trnava: Alumni Press

Podaci o skupu

8th International Scientific and Expert Conference TEAM 2016

poster

19.10.2016-21.10.2016

Slovačka

Povezanost rada

Strojarstvo