Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

Information System Infrastructure Planning - Threshold Setting Based on Risk Analysis (CROSBI ID 639120)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Golub, Ivana ; Radojević, Branko Information System Infrastructure Planning - Threshold Setting Based on Risk Analysis // Proceedings of 37th International Convention for Information and Communication Technology, Electronics and Microelectronics (MIPRO 2014). Rijeka: Hrvatska udruga za informacijsku i komunikacijsku tehnologiju, elektroniku i mikroelektroniku - MIPRO, 2014

Podaci o odgovornosti

Golub, Ivana ; Radojević, Branko

engleski

Information System Infrastructure Planning - Threshold Setting Based on Risk Analysis

Information systems infrastructure planning performed based on the data collected from network monitoring and asset management systems can be developed further to include risk assessment and analysis as an input to the threshold setting methods in the two-dimensional load- age balance graph. The two-dimensional load-age balance graph is used to present generic value for network devices load gathered as measured values through the network managements system, and age - gathered from the asset management system. Threshold lines are defined in such graph to present areas of different interest from the perspective of low-high age, low-high load, or some other selection criteria. This paper explores how the threshold values can be set to reflect risk assessment methodology of the owner/maintainer/user. The position of each networking device in the graph is unique, disregarding the threshold values. However, the total score for the system, determined based on the position of a device in the graph area, depends on the defined threshold. The paper analyzes the impact of the threshold change based on the risk assessment criteria to the total score for a system. The total score can then be used to compare different systems, or to compare the same system in time.

information system infrastructure planning risk assessment

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

2014.

objavljeno

Podaci o matičnoj publikaciji

Rijeka: Hrvatska udruga za informacijsku i komunikacijsku tehnologiju, elektroniku i mikroelektroniku - MIPRO

Podaci o skupu

MIPRO 2014

predavanje

25.05.2014-29.05.2014

Opatija, Hrvatska

Povezanost rada

Računarstvo