Comparation of Variants for New Peljesac Bridge in Croatia (CROSBI ID 635372)
Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Radić, Jure ; Šavor, Zlatko ; Srbić, Mladen
engleski
Comparation of Variants for New Peljesac Bridge in Croatia
The southern part of Croatia, including the city of Dubrovnik, is currently separated from the rest of Croatia by a small coastal stretch belonging to the state of Bosnia and Herzegovina. A fixed link between all parts of Croatia will be established after completion of the Mainland- Peljesac Peninsula Bridge. Construction of the bridge started in 2007, but it was slowed down and finally abandoned in 2012 due to lack of funds. The client recently requested new economically more viable solutions. Two alternative bridge solutions were proposed in the new preliminary design, a continuous steel beam bridge and a multi-span extrados semi-integral bridge with hybrid deck. Finally, the multi-span extradosed semi- integral bridge with hybrid deck was chosen for further design.
box girder bridge; multi-span extradosed semi-integral bridge; steel deck; hybrid deck; deep foundations; cable stayed steel bridge.
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
427-434.
2015.
objavljeno
Podaci o matičnoj publikaciji
Multi Span Large Bridges
Pacheco, Pedro ; Magalhaes, Filipe
London : Delhi: CRC Press ; Taylor & Francis
978-1-138-02757-2
Podaci o skupu
Multi Span Large Bridges
predavanje
01.07.2015-03.07.2015