Preparation of Large Scale Wind Integration in South East Europe (CROSBI ID 628214)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Majstrović, Goran ; Bajs, Davor ; Dobrijević, Đorđe Preparation of Large Scale Wind Integration in South East Europe // IEEE Power and Energy Society General Meeting 2012. San Diego (CA), 2012. str. 1-8

Podaci o odgovornosti

Majstrović, Goran ; Bajs, Davor ; Dobrijević, Đorđe

engleski

Preparation of Large Scale Wind Integration in South East Europe

This paper presents the main technical issues raised by large wind power plants integration in South East Europe. Regional wind power plant (WPP) integration perspective of necessary grid reinforcements, system balancing and network losses are described. The analyses were based on the power system and WPP input data collected and verified by the 12 TSOs through different questionnaires and intensive cooperation in the last few years

Wind power plants; grid integration; South East Europe

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

1-8.

2012.

objavljeno

Podaci o matičnoj publikaciji

IEEE Power and Energy Society General Meeting 2012

San Diego (CA):

Podaci o skupu

IEEE Power and Energy Society General Meeting 2012

predavanje

22.07.2012-26.07.2012

San Diego (CA), Sjedinjene Američke Države

Povezanost rada

Elektrotehnika