Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

New Graphical Approach to Railway Infrastructure Capacity Analysis (CROSBI ID 220743)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Gašparik, Jozef ; Abramović, Borna ; Halas, Martin New Graphical Approach to Railway Infrastructure Capacity Analysis // Promet, 27 (2015), 4; 283-290. doi: 10.7307/ptt.v27i4.1701

Podaci o odgovornosti

Gašparik, Jozef ; Abramović, Borna ; Halas, Martin

engleski

New Graphical Approach to Railway Infrastructure Capacity Analysis

A variety of methodologies are being used across Europe for the estimation of railway infrastructure capacity. This paper introduces the basic principles of the methodologies used – analytical methodology (e.g. Slovak railways), UIC methodology, and the graphically developed methodology of the Department of Railway Transport, University of Žilina (KŽD). On the basis of these new approaches, the occupation time estimation is researched. This new method is based on a graphic approach that uses operational time intervals as part of occupation time in accordance with the Slovak methodology. The new methodology concerns graphic capacity estimation and is a conceptual framework developed by the authors for easier evaluation of occupation time in train traffic diagrams.

capacity estimation ; train traffic diagram ; occupation time ; detection path ; indicators

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

27 (4)

2015.

283-290

objavljeno

0353-5320

1848-4069

10.7307/ptt.v27i4.1701

Povezanost rada

Tehnologija prometa i transport

Poveznice
Indeksiranost