Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Comparison of Predicted and Actual Conditions of the Rock Mass in the Tunnel Stražina (CROSBI ID 623998)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Ravnjak, Katarina ; Grget, Goran ; Kovačević, Meho Saša Comparison of Predicted and Actual Conditions of the Rock Mass in the Tunnel Stražina // Rock Engineering and Rock Mechanics: Structures in and on Rock Masses / Alejano, Leandro R. ; Perucho, Aurea ; Olalla, Claudio et al. (ur.). London : Delhi: Taylor & Francis, 2014. str. 757-762

Podaci o odgovornosti

Ravnjak, Katarina ; Grget, Goran ; Kovačević, Meho Saša

engleski

Comparison of Predicted and Actual Conditions of the Rock Mass in the Tunnel Stražina

The aim of this paper is to examine and compare the results of engineering geological exploration works in the design phase and during the construction of tunnel Stražina. Tunel Stražina is located near the city of Omiš on Zagreb-Split-Dubrovnik highway in Croatia. The interactive design method was applied in the tunnel design. This methodology integrates the empirical, rational and observational approaches in the geotechnical design of the tunnel. It allows for the thorough and comprehensive overview and problem solving during the construction. In addition, it minimizes the errors that may occur due to the limitations of each individual approach. Predicted underground excavation support solutions were done based on site investigation activities and other bases using the empirical and rational approaches. Geomechanical and Q classification were performed as a part of the empirical approach. Engineering-geological tunnel mapping was done during the excavation activities as a part of the geotechnical monitoring. Verification of the tunnel support system during the construction phase was done using the actual data obtained from the engineering-geological mapping and the monitoring. Thus, the actual rock mass quality along the tunnel was determined and the tunnel underground excavation support measures were optimized. Due to the complex conditions present in the rock mass, the discrepancy between estimated and actual rock mass conditions can hardly be avoided, and likewise, a certain amount of discrepancy between the predicted and actual support systems is also to be ex-pected. The interaction of site investigation, design and construction, in addition to introducing the risk analy-sis, is essential for a more rational, safer and more economical construction. Development of methods and procedures for the preparation and control for each of the phases is important for a successful operation of each participant performing a completion of a particular phase, as well as for the project investor.

Tunnel; RMR; Monitoring

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

757-762.

2014.

objavljeno

Podaci o matičnoj publikaciji

Rock Engineering and Rock Mechanics: Structures in and on Rock Masses

Alejano, Leandro R. ; Perucho, Aurea ; Olalla, Claudio ; Jimenez, Rafael

London : Delhi: Taylor & Francis

978-1-315-74952-5

Podaci o skupu

Eurock 2014

poster

27.05.2014-29.05.2014

Vigo, Španjolska

Povezanost rada

Građevinarstvo