Involvement of SDEWES Centre and University of Zagreb in the field of Green Energy
Consequences of market liberalisation: Demission of base load The importance of balancing power (gas, hydro) Cycling of old coal power plants (4000 hours by 2020) End of need for feed-in tariff Market arbitrage (time delay, power-heat, power-water, demand management) Electromobility Only personal cars and short distance utility vehicles If RESe 80% reduction of primary energy Fast charging 70 kW – huge problem if left uncontrolled, ex AT, 4 mln cars arrives home, plugs in – 280 GW (14 GW installed cap) Smart charging – market based, smoothing the demand Transport – road freight, shipping, aviation cannot be electrified High temperature processes sometimes cannot be electrified Both makes last 20% of demand If biomass is used only for the above it could cover half of the missing demand
Green Energy
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
2014.
nije evidentirano
Podaci o matičnoj publikaciji
Podaci o skupu
Green Energy Forum
pozvano predavanje
19.06.2014-19.06.2014