Load Management Scheme Using Air Conditioning Electric Power Consumption and Photovoltaic Power System Generation (CROSBI ID 208719)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Klaić, Zvonimir ; Šljivac, Damir ; Fekete, Krešimir ; Kraus, Zorislav Load Management Scheme Using Air Conditioning Electric Power Consumption and Photovoltaic Power System Generation // Journal of energy and power engineering, 8 (2014), 11; 1926-1932

Podaci o odgovornosti

Klaić, Zvonimir ; Šljivac, Damir ; Fekete, Krešimir ; Kraus, Zorislav

engleski

Load Management Scheme Using Air Conditioning Electric Power Consumption and Photovoltaic Power System Generation

In the last few decades, in the world and also in the European Union, considerable resources have been invested in the rapid development of renewable energy sources and distributed generation in general. At the same time, power consumption is continuously increasing, and consumers are becoming more complex, which ultimately requires new investments in the distribution network. Concept of Smart Grids is generally accepted as a possible solution. Smart grid is a concept with many elements, where monitoring and control of every element in the chain of production, transmission, distribution and final consumption enables much more efficient delivery and use of electricity. One of the elements of smart grid efficiency is the ability of real-time demand-supply balancing. This balancing is carried out by monitoring of consumption and redistribution of electricity among individual end users, according to their needs. The aim of this paper is creating algorithm for real-time load management using power measurements. Algorithm for real-time load management at the Faculty of Electrical Engineering in Osijek (ETFOS), Croatia is created based on measurements of photovoltaic power plant production, the power consumption of air conditioning system and the faculty building total electricity consumption. Expected result of real-time re-dispatching of air conditioners consumption, depending on the level of electricity production in photovoltaic power plant is decreasing peak demand of the faculty.

Photovoltaic Power Plant ; Smart Grid ; Load Management ; Air Conditioning System ; Power Measurements

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

8 (11)

2014.

1926-1932

objavljeno

1934-8975

Povezanost rada

Elektrotehnika