Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Importance of temporary traffic regulation during construction or reconstruction of roads (CROSBI ID 610415)

Prilog sa skupa u zborniku | stručni rad | međunarodna recenzija

Dimter, Sanja ; Dragovan, Hrvoje ; Opačak, Dalibor ; Moser, Vladimir Importance of temporary traffic regulation during construction or reconstruction of roads // Road and Rail Infrastructure III / Lakušić, Stjepan (ur.). Zagreb: Građevinski fakultet Sveučilišta u Zagrebu, 2014. str. 167-173

Podaci o odgovornosti

Dimter, Sanja ; Dragovan, Hrvoje ; Opačak, Dalibor ; Moser, Vladimir

engleski

Importance of temporary traffic regulation during construction or reconstruction of roads

During construction work on individual road network sections it is necessary, for shorter or longer period of time, to close for traffic some small part or even the entire length of the section. At the same time, unobstructed traffic should be ensured redirecting to the nearby road routes or, if no such routes exist, constructing temporary (or permanent) road sections and intersections is needed. Traffic redirection during the construction or reconstruction of high priority roads, with heavy traffic volume, is a problem which is additionally enhanced in cases of main city routes. An example of such problem is the South Osijek Bypass, a part of the D2 Croatian state road. With traffic load of 18, 500 vehicles/day AADT (Average Annual Daily Traffic), this is one of the busiest roads in Croatia. The role of South Osijek Bypass is traffic redirection outside the city and connection of major roads to Našice (D2) and Valpovo (D36) to the west, Vukovar (D2) and Erdut (D213) to the east, Beli Manastir (D7) in the north and Ðakovo (D7) and Vinkovci (D518) to the south. Northern pavement of South Osijek Bypass was built between 1973 and 1989 year with two traffic lanes intended for two-way traffic while the southern pavement extension was postponed because of, at that point, insufficient traffic volume. Southern pavement construction started in year 2011, during which extension of four intersections and building of a whole one new intersection was needed. Given that the old, northern pavement was constantly under heavy traffic, the solution of temporary traffic regulation during the works was a particular challenge for the designer. The paper describes traffic solutions for unobstructed traffic flow during construction works on the southern pavement extension of South Osijek Bypass with special emphasis on the importance of quality traffic flows diverting.

temporary traffic regulation ; reconstruction of road ; South Osijek Bypass ; heavy traffic volume ; traffic flow regulation

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

167-173.

2014.

objavljeno

Podaci o matičnoj publikaciji

Road and Rail Infrastructure III

Lakušić, Stjepan

Zagreb: Građevinski fakultet Sveučilišta u Zagrebu

1848-9842

Podaci o skupu

3rd International Conference on Road and Rail Infrastructures-CETRA 2014

predavanje

28.04.2014-30.04.2014

Split, Hrvatska

Povezanost rada

Građevinarstvo