Assessment of Masonry Arch Bridge with Concrete Deck (CROSBI ID 609989)
Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Kindij Alex ; Mandić Ivanković Ana ; Vasilj Marin
engleski
Assessment of Masonry Arch Bridge with Concrete Deck
The assessment of a masonry arch bridge, built more than 110 years ago and widened twice with concrete decks during it service life, is presented in this paper. Conservative methods for the assessment of the load-carrying capacity of masonry arch bridges are shortly overviewed. Additionally the bridge deck cantilever is evaluated due to the bad condition of the second widening deck, taking into account the possibility of vehicle impact on the guardrail. Results are discussed and the deck cantilever replacement with the adequate new reinforcement is proposed.
Assessment; masonry arch bridges; conservative methods; concrete deck; vehicle impact to the guardrail; cantilever replacement.
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
723-730.
2013.
objavljeno
Podaci o matičnoj publikaciji
Proceedings of the 7th international Conference on Arch Bridges – ARCH 2013
Radić Jure ; Kušter Marija ; Šavor Zlatko
Zagreb: SECON - CSSE
978-953-7621-16-2
Podaci o skupu
Arch 2013
predavanje
04.10.2013-06.10.2013
Trogir, Hrvatska