Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Time Analysis in the Preparatory Operations of Warp and Weaving (CROSBI ID 92001)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Kovačević, Stana ; Orešković, Vladimir Time Analysis in the Preparatory Operations of Warp and Weaving // Fibres & textiles in Eastern Europe, 7 (1999), 4; 50-53-x

Podaci o odgovornosti

Kovačević, Stana ; Orešković, Vladimir

engleski

Time Analysis in the Preparatory Operations of Warp and Weaving

The production effectiveness of technical means is a result of technical solutions, which secure the needed reability and good product quolity during satisfactory time intervals, as well as a result of the project and realisation of the control systems of the wears and tear process of elements and of the processing correctness of these technical means.

textile manufacturing systems; diagnostic systems; mathematical formalization; control system

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

7 (4)

1999.

50-53-x

objavljeno

1230-3666

Povezanost rada

Tekstilna tehnologija

Indeksiranost