Simulation in Testing Transport System Parameters Affecting Process Lead Time (CROSBI ID 591056)
Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Veža, Ivica ; Bilić, Boženko ; Grčić, Branko
engleski
Simulation in Testing Transport System Parameters Affecting Process Lead Time
The paper describes the effect of transport system parameters on rhe process lead time in the production system. A concept of a metamodel has been developed with the aim of providing the analysis of transport system parameters. Testing is performed by simulation runs on several production systems of similar characteristics, established according to group technology principle. the regression analysis has shoen a high degree of accuracy and reliability in the relation between the process lead time and selected relevant parameters.
simulation; transport system; process lead time; production island; regression analysis
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
1996.
objavljeno
Podaci o matičnoj publikaciji
Proceedings of the IASTED International Conference on Modelling, Simulation and Optimization
Hamza, M. H.
Lahti: The International Association of Science and Technology for Development - IASTED
0-88986-197-8
Podaci o skupu
IASTED International Conference on Modelling, Simulation and Optimization
predavanje
06.05.1996-09.05.1996
Gold Coast, Australija