An EPEC Approach to the Yearly Maintenance Scheduling of Generating Units (CROSBI ID 183668)
Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Pandžić, Hrvoje ; Conejo, Antonio ; Kuzle, Igor
engleski
An EPEC Approach to the Yearly Maintenance Scheduling of Generating Units
This paper considers the yearly maintenance scheduling of generating units within a market environment. Each producer schedules its units’ maintenance periods to maximize its profit using a bilevel approach. The upper-level problem of this bilevel model seeks maximum profit and contains unit scheduling constraints, while the lower-level problems represent the market clearing process under different operating conditions. This single producer maintenance problem can be recast as a mathematical program with equilibrium constraints (MPEC). Since the MPECs of all producers have to be considered simultaneously and the market clearing process is common to all of them, the proposed formulation for maintenance scheduling is an equilibrium problem with equilibrium constraints (EPEC) corresponding to a multiple- leader-common-follower game. The solution of this EPEC is a set of equilibria, in which none of the producers is able to increase its profit unilaterally by changing the maintenance periods of its generating units.
Equilibrium Problem with Equilibrium Constraints; Generating Units; Maintenance Scheduling
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o izdanju
28 (2)
2013.
922-930
objavljeno
0885-8950
10.1109/TPWRS.2012.2219326