Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Modern Assembly System in Footwear Production (CROSBI ID 477850)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Agić, Ante ; Mijović, Budimir Modern Assembly System in Footwear Production // Proceedings of the 11th InternationalDAAAM Symposium "Intelligent Manufacturing & Automation: Man-Machine-Nature" / Katalinić, B. (ur.). Opatija, 2000. str. 000-S002-x

Podaci o odgovornosti

Agić, Ante ; Mijović, Budimir

engleski

Modern Assembly System in Footwear Production

A new organisational forms in shoe production a RINK-system have been introduced. Some subassembly configuration problems of the global assembly system is formulated and solved by a tabu search based algorithm. Bucket brigade is one possible way of simulation of group work in assembly line. Focus is made on the creation of a flexible and modular footwear production with automatisation of the final operation of assembly accros simulation.

Assembly; modular production; footwear

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

000-S002-x.

2000.

objavljeno

Podaci o matičnoj publikaciji

Proceedings of the 11th InternationalDAAAM Symposium "Intelligent Manufacturing & Automation: Man-Machine-Nature"

Katalinić, B.

Opatija:

Podaci o skupu

Annals of DAAAM for 2000 & 11th International DAAAM Symposium "Intelligent Manufacturing & Automation: Man-Machine-Nature"

predavanje

19.10.2000-21.10.2000

Opatija, Hrvatska

Povezanost rada

Kemijsko inženjerstvo