Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

Lean built-in quality transformation of ship block assembly (CROSBI ID 585298)

Prilog sa skupa u zborniku | izvorni znanstveni rad | domaća recenzija

Kolić, Damir ; Fafandjel, Nikša ; Hadjina, Marko Lean built-in quality transformation of ship block assembly // Zbornik radova IV. Savjetovanje o morskoj tehnologiji 2011. / Rožanić, Igor (ur.). Rijeka: Fintrade & Tours, 2011. str. 218-230

Podaci o odgovornosti

Kolić, Damir ; Fafandjel, Nikša ; Hadjina, Marko

engleski

Lean built-in quality transformation of ship block assembly

The accuracy control of assembled steel blocks in most shipyards today is performed by inspecting and repairing in quality. This results in a production halt during the inspection phase. Transforming the shipyard block assembly process to apply the lean built-in quality assembly method is advantageous because it results in interim products assembled right the first time without any adjustments. As a result, added value activities are enhanced while non-value added activities are decreased. This paper demonstrates from a shipyard case study how the lean manufacturing built-in quality transformation of the ship block assembly method improves productivity and quality simultaneously.

shipbuilding; lean manufacturing; built-in quality; ship block assembly

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

218-230.

2011.

objavljeno

Podaci o matičnoj publikaciji

Zbornik radova IV. Savjetovanje o morskoj tehnologiji 2011.

Rožanić, Igor

Rijeka: Fintrade & Tours

1848-3976

Podaci o skupu

IV. Savjetovanje o morskoj tehnologiji 2011.

predavanje

26.11.2011-26.11.2011

Rijeka, Hrvatska

Povezanost rada

Brodogradnja, Strojarstvo