Comparative simulations of the heavy machining production system (CROSBI ID 177607)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Stanković, Igor ; Car, Zlatan, Barišić, Branimir Comparative simulations of the heavy machining production system // Engineering review (Technical Faculty University of Rijeka), 31 (2011), 1; 1-11

Podaci o odgovornosti

Stanković, Igor ; Car, Zlatan, Barišić, Branimir

engleski

Comparative simulations of the heavy machining production system

The purpose of this research is to focus on the solution of the resource sizing problem for the real production system. The resource sizing problem is tackled by usage of the mathematical makespan minimization method and comparative simulations of the two different production models. Only two production model simulations were realized due to specificities of the handled production system. Simulation results were presented, compared and discussed. This paper presents an approach which allows studying the heavy machine sizing problem realistically, through the use of simulation tools. The approach used would be of great help in making a decision on whether two new heavy machines should be introduced into an existing production system or not.

simulation; optimization; machining; production planning; production line design; Job shop system;

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

31 (1)

2011.

1-11

objavljeno

1330-9587

Povezanost rada

Metalurgija, Računarstvo, Strojarstvo

Poveznice
Indeksiranost