Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

Deliverable 5.6: Assessment and validation of relative performance of control strategies (CROSBI ID 768726)

Druge vrste radova | izvještaj

Spudić, Vedrana ; Jelavić, Mate ; Baotić, Mato ; Perić, Nedjeljko Deliverable 5.6: Assessment and validation of relative performance of control strategies // Aeolus deliverable 5.6. 2011.

Podaci o odgovornosti

Spudić, Vedrana ; Jelavić, Mate ; Baotić, Mato ; Perić, Nedjeljko

engleski

Deliverable 5.6: Assessment and validation of relative performance of control strategies

This report consists of two parts: I)Experiments on Thanet wind farm and II) Validation of control strategies in simulation. The first part describes the experiments conducted on Thanet wind farm. It consists of three experiments: I) Validation of wind farm models developed in WPs 2 and 5 – reported by the research group at the Aalborg University, II) Validation of static feedforward wind farm model developed in WP 4 – reported by the research group at the Lund University, and III) Validation of wind turbine control model developed in WP 3 – reported by the research group at the University of Zagreb. The second part describes the validation of the control strategies performed in simu- lation environment. This part is reported by the research group at the University of Zagreb. The plans for all the experiments, both in simulation and at Thanet wind farm, can be found in Deliverable 1.6a Plan for validation of control strategies – Addendum.

wind farm control

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

Aeolus deliverable 5.6

2011.

nije evidentirano

objavljeno

Povezanost rada

Elektrotehnika, Računarstvo, Temeljne tehničke znanosti