Construction time-cost model in Croatia


Car-Pušić, Diana; Radujković, Mladen
Construction time-cost model in Croatia // International journal for engineering modelling, 22 (2009), 1-4; 63-70 (međunarodna recenzija, članak, znanstveni)


Naslov
Construction time-cost model in Croatia

Autori
Car-Pušić, Diana ; Radujković, Mladen

Izvornik
International journal for engineering modelling (1330-1365) 22 (2009), 1-4; 63-70

Vrsta, podvrsta i kategorija rada
Radovi u časopisima, članak, znanstveni

Ključne riječi
Construction time; „time-cost“ model; constants K and B; linear regression analysis; building projects

Sažetak
The paper deals with the applicability of the «time-cost» model for calculating the sustainable construction time for building projects in Croatia. In this model the time is expressed as a function of money in the project, while the specific constants K and B need to be determined. These constants depend on economic characteristics of the country or a larger area and therefore had to be separately calculated for a region with similar economic characteristics. The modeling of the constants was performed for two groups of building projects – the roads and residential and office multi-storey buildings. The obtained results have been analyzed and compared to the corresponding results from abroad.

Izvorni jezik
Engleski

Znanstvena područja
Građevinarstvo



POVEZANOST RADA


Projekt / tema
082-0822156-2993 - Upravljanje rizikom i promjenama u projektno usmjerenom građevinskom poslovanju (Mladen Radujković, )

Ustanove
Građevinski fakultet, Zagreb,
Građevinski fakultet, Rijeka

Časopis indeksira:


  • Scopus