Energy-economic analysis of CHP turbine with three-stage heating of district heating system water (CROSBI ID 561829)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Guzović, Zvonimir ; Jukić, Perica ; Lončar, Dražen Energy-economic analysis of CHP turbine with three-stage heating of district heating system water // CD Proceedings of ECOS 2009 / Nebra, Silvia Azucena ; de Oliveira Junior, Silvio ; Bazzo, Edson (ur.). São Paulo: ABCM - The Brazilian Society of Mechanical Sciences and Engineering, 2009. str. 687-698

Podaci o odgovornosti

Guzović, Zvonimir ; Jukić, Perica ; Lončar, Dražen

engleski

Energy-economic analysis of CHP turbine with three-stage heating of district heating system water

Today the district heating is predominantly based on cogeneration power plants with steam turbines for combined heat and power production (CHPT) with controlled steam extractions (CE). In case of stagewise heating of district heating system water, the whole heating is realised in a number of successively connected water heaters by steam extracted from the turbine. This results in additional production of electric power because heating steam extracted for the first stage in the direction of system water flow, has lower pressure than for the second stage. In CHPTCE when operating in heating load regimes, the steam flow to the condenser still is not permitted to be zero. There is minimal steam flow rate which is required for the cooling of the low-pressure stages. For recovering this heat, the condenser has additional built-in bundle tubes, which can be fed with returned system water from district heating. On this way the built-in bundles in condensers of CHPTCE make the third stage of stagewise heating of system water. The paper objective is to determine feasibility of the three-stage heating of system water by Cleaner Production Methodology on example of CHPTCE of 120 MW power installed in the Cogeneration Power Plant Zagreb (TE-TO Zagreb). The results of the energy and economic analysis show high feasibility of the three-stage system water heating application.

cogeneration power plant ; CHP steam turbine ; district heating ; energy-economic analysis

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

687-698.

2009.

objavljeno

Podaci o matičnoj publikaciji

CD Proceedings of ECOS 2009

Nebra, Silvia Azucena ; de Oliveira Junior, Silvio ; Bazzo, Edson

São Paulo: ABCM - The Brazilian Society of Mechanical Sciences and Engineering

2175-5426

Podaci o skupu

22nd International Conference on Efficiency, Cost, Optimization, Simulation and Environmental Impact of Energy Systems

predavanje

31.08.2009-03.09.2009

Foz do Iguaçu, Brazil

Povezanost rada

Strojarstvo