Monitoring and Back Numerical Analyses in the Konjsko Tunnel (CROSBI ID 561453)
Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Arapov, Ivan ; Kovačević, Meho-Saša ; Lušo, Petar
engleski
Monitoring and Back Numerical Analyses in the Konjsko Tunnel
The Konjsko tunnel is an integral part of the Zagreb-Split-Dubrovnik highway, section Prgomet- Dugopolje. It consists of two tunnel tubes having 1326.0 and 1133.8 meters in length. The greatest overburden amounts to 150 m. This paper presents geotechnical measurement results and back numerical analyses. Back numerical analyses in combination with geotechnical measurements enable safer and more rational approach to designing and performing underground constructions. They contribute to the development of cognition on rock massifs and to determining its physically- mechanical parameters, joining it with rock classifying results. They can help to verify or to modify characteristics of the primary support system, of the foreseen progress length, estimated time of non-supported ranges, as well as time and schedule of performing all works regarding the excavation stability.
Monitoring; Back Numerical Analyses; Tunnel
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
533-538.
2009.
objavljeno
Podaci o matičnoj publikaciji
Proceedings of the Regional Symposium of the International Society for Rock Mechanics (ISRM) : Rock Engineering in Difficult Ground Conditions - Soft Rocks and Karst
Vrklja, Ivan
Amsterdam : Leiden: Balkema ; CRC Press
978-0415804813
Podaci o skupu
Regional Symposium of the International Society for Rock Mechanics : Rock Engineering in Difficult Ground Conditions - Soft Rocks and Karst
predavanje
29.10.2009-31.10.2009
Cavtat, Hrvatska